Site Exit & Clean Up
At the end of the scheduled maintenance, approved contractors or SPEL maintenance crew are required to
reinstate the site to pre-existing conditions. Steps included but limited to are:
• Ensure all access covers are securely inserted back into their frames;
• Remove and dispose collected pollutants from the site in accordance with local regulator authorities;
• Retrieve all traffic control measures and maintenance tools; and
• Return all exhausted and/or damaged SPEL products to SPEL Stormwater to begin recycling program.