background image

0118738R9 Page 6 of 17

Figure 5A

Figure 5

Quick-

release 

lever

Optional Rack Cube

The removable rack cube (12RU) simplifies installation and provides the ability to integrate equipment 

remotely.  The cube can be installed into the lectern at a later date.  The cube also provides mounting 

capabilities for multiple cooling fans if necessary.  Compatible with most 4.75” cooling fans with 4.13” 

mounting hole spacing (12 mounting locations available).  

Figure 5

.

1.  To remove the rack cube, open or remove the doors.  

Figure 5A

.

2. 

Unscrew the #14 x 7/8” PHSM screw from the base, and slide out the cube. 

 Figure 5

.

•  To move the rack cube to the other side of the lectern, all that is needed is to remove the (5) 

bumper stops in the base panel with a 4mm hex wrench, and relocate them to the opposite side of 

the base panel.  The doors can easily be removed and switched using the quick-release levers.

Removable Rack Cube

(Can be installed on left 

or right-side)

Primary Door

(Removable-can be installed 

on left or right-side)

Secondary Door

(Removable-can be installed 

on left or right-side)

(1) #14 x 7/8 

PHSM to secure 

cube to base

Keyboard Tray / Drawer

1. 

To flip, pull the tray out fully and locate the black plastic lever 

on each slide.  

Figure 4

.

2.  Release the levers on the both slides while pulling the tray out.

3. 

Flip the tray over, re-align the slides, and push back in.

Note: Can be used as a keyboard tray, or flipped and used as a drawer.

Figure 4

Push here on both 

slides to release

Keyboard Tray

Содержание Elite Lectern 55258

Страница 1: ...dommag espendantletransportdoiventfaire l objetd unrapportdansles5joursdeleurr ception Veuillez prendrecontactavecnoussidespi cesmanquentousont ab m es sivousavezdesquestions ouencorepouracheter despi...

Страница 2: ...1 4 20 x 40mm JC bolts 4 052605 1 4 20 x 15mm JC bolts 1 025039 4mm Hex wrench Note If the toe kick will be anchored to the floor 4 fasten ers are required that will work with the 1 2 diameter holes...

Страница 3: ...d 14 x 7 8 PHSM screw Figure 1C 4 From inside the lectern on audience side install 2 1 4 20 x 40mm JC bolts through the base panel to secure the assembled skirt and tighten securely Figure 1C Note The...

Страница 4: ...e Magnets are installed at the top corners of the panel to prevent tipping Figure 2B 3 Carefully pull the top of the panel away from the lectern to release the magnets then lift the panel out Figure 2...

Страница 5: ...d to be hinged from the left or right side To switch the hinge side 1 Remove the door using the quick release lever Figure 3B 2 Rotate the door 180 Figure 3C 3 The vented panel should be located on th...

Страница 6: ...of the lectern all that is needed is to remove the 5 bumper stops in the base panel with a 4mm hex wrench and relocate them to the opposite side of the base panel The doors can easily be removed and s...

Страница 7: ...shelf assembly Attaching to laminate side panels 1 Open the lectern door and remove the rack cube if equipped 2 From inside the lectern use a drill with a 3 16 drill bit and slowly drill out the corr...

Страница 8: ...brackets to lectern 1 Extend and lock each folding shelf bracket into the horizontal position 2 Select the fasteners needed Metal or laminate side panels 3 Install the 4 lower screws into the side pa...

Страница 9: ...each cutout needed 3 Identify the depth of your device to verify it will not interfere with the worksurface or any other objects under the overbridge when the panel is attached Figure 7C 4 When the c...

Страница 10: ...depth of the installed device The available worksurface opening under the overbridge on your specific Spectrum lectern Note The Overbridge Control Console has been designed for many of the currently a...

Страница 11: ...fasteners 4 At this point wiring connections can be made under the lectern with easier access to the base panel grommet holes Note If the toe kick will be anchored to the floor 4 fasteners are require...

Страница 12: ...rs Push slowly and carefully Do not move over uneven or irregular surfaces Do not allow children to move Lock the casters after moving Do not park unit in areas of heavy traffic Do not run power cords...

Страница 13: ...require a first time logo charge Customer installed Dimensions 30 W 76 2 cm x 12 H 30 48 cm Available logo area 28 W 71 1 cm x 10 H 25 41 cm Unit weight 6 lb 2 7 kg Shipping weight 8 lb 3 6 kg 26 D 6...

Страница 14: ...Customer installed Shipping weight 12 lb 5 4 kg Two piece Overbridge Insert Panel Large 96513 Blank panel split Large 2 required Split panel for overbridge version only Contact Spectrum to specify cut...

Страница 15: ...ed Electric Fan Voltage 115VAC single phase Power 5 5W Current 08A 1450 RPM Dimensions 119 mm x 119 mm Ball Bearing Noise 28 dB Air flow 49 4 CFM 1 40m min Frame material Aluminum Blade material Polyc...

Страница 16: ...celui ci Si une maintenance est requise communiquer avec Spectrum Industries pour obtenir de l aide Consignes de s curit en lectricit Ne pas brancher le cordon d alimentation sur une rallonge V rifie...

Страница 17: ...y monitored throughout the production process through our Quality Management System We expressly warrant that Spectrum products will be of good quality and workmanship and free from defect for the per...

Отзывы: