0120148 Page 8 of 13
Optional Toe Kick Kit
1.
Position the toe kick on the floor in the preferred final lectern location.
Figure 9A
.
2.
Mark the (4) mounting hole locations onto the floor.
(The toe kick mounting holes are 1/2” dia.)
3.
Drill suitable holes into the floor and anchor the toe kick with
appropriate fasteners.
4. At this point, wiring connections can be made under the lectern with
easier access to the base panel grommet holes.
Figure 9A
Note: If the toe kick will be anchored to the floor, (4) fasteners are
required that will work with the 1/2” diameter holes on the toe kick. Due
to the wide variety of flooring materials and conditions possible, anchor
fasteners are not provided.
(4) 1/2” mounting
holes for floor anchors
Toe kick
4mm Hex
wrench
(included)
Tools
Required
Floor
Media Director Lectern
5. Move lectern into position over the anchored toe kick.
Figure 9B
.
6. Align the (4) base panel mounting holes (instructor-side) with the toe kick
panel mounting holes.
Toe kick panel
anchored to floor
7. Open or remove both doors.
8. Install (4) 1/4-20 x 40mm JC bolts through the base
panel to secure, and tighten securely.
Figure 9C.
1/4-20 x 40mm JC bolts
(4 required)
Figure 9C
Figure 9B