![Spectrum Industries 55199 Скачать руководство пользователя страница 3](http://html1.mh-extra.com/html/spectrum-industries/55199/55199_assembly-instructions_1344900003.webp)
0119509R1 Page 3 of 3
925 FIRST AVENUE, CHIPPEWA FALLS, WI 54729 / 800-235-1262 / 715-723-6750 / WWW.SPECTRUMFURNITURE.COM
Flip-up panel
Audience side
panel lock access
Figure 2A
Figure 2B
Figure 2C
Audience-side
panel
1/4-20 locknuts
(6 required)
Logo panel
Removed
Audience-side
panel
1.
Locate and flip-up the audience-side flip-up panel.
Figure 2A
.
2. Unlock the two panel locks.
3. Carefully lift out the audience-side panel.
Figure 2B
.
Director Lectern (55213) Installation:
4. Locate the (6) starter holes in the back of the audience-side panel.
Figure 2C
.
5. Using a 3/8” drill bit, slowly drill completely through the panel at the 6 hole locations.
6. Align the logo panel studs with the drilled holes and secure with (6) 1/4-20 locknuts.
Figure 2D
.
7. To re-install the audience-side panel, insert the panel tabs into the slots in the base panel, then
tip the panel back into position, and re-lock the locks.
Use a sharp 3/8” drill bit to drill out the (4) existing starter holes.
Drill slowly to minimize laminate chip-out around the holes.
Placing masking tape on the laminate-side of the panel at the
hole locations before drilling will also help minimize chip-out.
Figure 2D
Removed
Audience-side
panel
Carefully drill through
the panel with a 3/8”
drill bit (6 holes total)
Slots in base panel