Spectrum Industries 55199 Скачать руководство пользователя страница 2

0119509R1 Page 2 of 3

5.  Locate the (6) starter holes in the back of the audience-side panel.  

Figure 1C

.

6.  Using a 3/8” drill bit, slowly drill completely through the panel at the 6 hole locations.

7.  Align the logo panel studs with the drilled holes and secure with (6) 1/4-20 locknuts.  

Figure 1D

.

8.  To re-install the audience-side panel, insert the panel tabs into the slots in the base panel, then 

tip the panel back into position.  Replace the knobs, and tighten securely.

Figure 1C

Figure 1D

Removed 

Audience-side 

panel

1/4-20 locknuts

(6 required)

Logo panel

Removed 

Audience-side 

panel

Carefully drill through 

the panel with a 3/8” 

drill bit (6 holes total)

Use a sharp 3/8” drill bit to drill out the (4) existing starter holes.  

Drill slowly to minimize laminate chip-out around the holes.  

Placing masking tape on the laminate-side of the panel at the 

hole locations before drilling will also help minimize chip-out.

Отзывы: