Operational Control of PDU

PEAKS - MAX, MIN, RESET 

Selecting PEAKS in the menu system allows the user to view the 

maximum and minimum values that have been recorded for both voltage 

and current for each distribution bank.  This feature also gives the user 

the option to reset these values.

LIMITS - MAX, MIN

Selecting LIMITS in the menu system allows the user to set the desired 

maximum and minimum values to monitor for each bank.  These values 

will be used by the unit as comparison limits while monitoring bank 

voltage and current levels.  Decisions concerning minor and major 

alarms will be based on this comparison.   

CONFIG - DISPLAY MODE

While in Monitor Mode, the unit can display the incoming voltage and 

current readings.  The menu system allows the user to select one of 

three display modes: CYCLE, FIXED, and BAR.

Selecting CYCLE causes the system to cycle the display of channel 

measurements.  Measurements will be shown in order of voltage 

channels and then current banks.

Selecting FIXED turns off the measurement display cycle.  Pressing the 

LEFT or RIGHT menu buttons while in FIXED mode moves to the next 

reading in the cycle list.

In BAR mode, a bar graph is displayed to show all measured bank 

currents at the same time.  The values are displayed on a 30 amp scale.

Minimum Current Channel A

Maximum Current Channel A

Minimum Current Channel B

Maximum Current Channel B

Minimum Current Channel C

Maximum Current Channel C

Minimum Current All Channel Total

Maximum Current All Channel Total

Minimum Voltage Channel A

Maximum Voltage Channel A

Minimum Voltage Channel B 

Maximum Voltage Channel B

Minimum Voltage Channel C

Maximum Voltage Channel C

Reset All Peaks

Minimum Current Channel A

Maximum Current Channel A

Minimum Current Channel B

Maximum Current Channel B

Minimum Current Channel C

Maximum Current Channel C

Minimum Current All Channel Total

Maximum Current All Channel Total

Minimum Voltage Channel A

Maximum Voltage Channel A

Minimum Voltage Channel B 

Maximum Voltage Channel B

Minimum Voltage Channel C

Maximum Voltage Channel C

Monitor Display Mode

Display Cycle time

Voltage Calibration Step 1 Chan A

Voltage Calibration Step 2 Chan A

Voltage Calibration Step 1 Chan B

Voltage Calibration Step 2 Chan B

Voltage Calibration Step 1 Chan C

Voltage Calibration Step 2 Chan C

Current Calibration Step 1 Chan A

Current Calibration Step 2 Chan A

Current Calibration Step 1 Chan B

Current Calibration Step 2 Chan B

Current Calibration Step 1 Chan C

Current Calibration Step 2 Chan C

Number of Channels

Contrast

Software Rev

Menu Tree

Alarm Acknowledgment

Incoming Power Peaks

Incoming Power Limits

System Configuration

None

Содержание 72A-190BQREM Series

Страница 1: ...72A 196BAREM Series 72A 190BQREM Series Installation and Operation Manual 3 Phase Power Monitoring and Distribution Unit June 2 2008 Rev 01 27 0027 0111...

Страница 2: ...he IP Address Configuration 11 Telnet Configuration Password 11 LAN Module Configuration Using a Telnet Connection 11 Set PDU and LAN Module to Factory Defaults 12 Exit Configuration Mode 13 LAN Modul...

Страница 3: ...nd basic installation instructions The person installing or integrating the PDU into an electronic system must be sup plied with this manual and read it to become familiar with the installation precau...

Страница 4: ...aximum Input Output Global Domestic Outlet Connectors 18 IEC C13 18 IEC C13 Load Current per Bank 16A maximum 13 9A maximum Load Current per Output Connector 10A maximum 10A maximum Load Current per P...

Страница 5: ...it 72A 196BAREM 01 72A 190BQREM 01 UL 60950 1 File E149758 A8 Volume X3 First Edition CSA C22 2 No 60950 1 03 First Edition IEC 60950 1 First Edition Product Category NWGQ INFORMATION TECH NOLOGY EQUI...

Страница 6: ...ings of the product Reduced Air Flow Installation of the equipment should be such that the amount of airflow required for safe operation of the equipment is not compromised Mechanical Loading Mounting...

Страница 7: ...to AC output connectors Continuous current draw for all connected units must not exceed the current rating per output Power source for PDU must be properly grounded Total current for all connected un...

Страница 8: ...manager If you are connecting the PDU directly to a PC without a router a crossover cable is required The module oper ates at 10 100MB sec via an Ethernet communication for both of these configuratio...

Страница 9: ...dule IP Address DHCP and Auto IP Connections and Installation The LAN module supports three IP assignment methods Static IP ad dress DHCP and Auto IP If a static address is enabled it will be used If...

Страница 10: ...igi_dev_disc exe has the following 1 Configure Network Settings is to configure the IP Subnet Gateway 2 Restart Device is to reboot the PDU after assigning the new network configuration 3 Refresh View...

Страница 11: ...and line of a PC or other networked device 2 Issue the following command ping ip address where ip address is the address you assigned to the device server Example ping 192 168 1 110 A reply should be...

Страница 12: ...aults back to the factory settings This command will ensure that both the LAN module and internal PDU microprocessor are returned to identical communication settings PDU with LAN modules should have a...

Страница 13: ...e LAN tools Locate the update file A If any network setting s on the LAN module are changed you must click Restart device to apply the changes B Place the update file image bin in C release C In comma...

Страница 14: ...stem The buttons are labeled with universal symbols for Menu Select Left and Right as shown in the following figure MENU Enters the menu system or moves one level up the tree SELECT Moves one level do...

Страница 15: ...yed to show all measured bank currents at the same time The values are displayed on a 30 amp scale Minimum Current Channel A Maximum Current Channel A Minimum Current Channel B Maximum Current Channel...

Страница 16: ...in the menu system for voltage and current This calibration is performed at the factory before shipment Operational Control of PDU Alarm Capabilities Each power bank has four major alarm thresholds t...

Страница 17: ...need ed in order to implement the SNMP functions To implement the Telnet and SNMP functions the device must be configured properly such as assigning a valid IP address or subnet mask by using the reco...

Страница 18: ...imum Voltage Bank B MAXV OK MAXV C 0 Reset Maximum Voltage Bank C MAXV OK MINV A 999 9 Reset Minimum Voltage Bank A MINV OK MINV B 999 9 Reset Minimum Voltage Bank B MINV OK MINV C 999 9 Reset Minimum...

Страница 19: ...0 BLLC T Read Low Threshold Current Bank T BLLC 22 0 MAXC A Read Maximum Current Bank A MAXC 22 5 MAXC B Read Maximum Current Bank B MAXC 22 5 MAXC C Read Maximum Current Bank C MAXC 22 5 MAXC T Read...

Страница 20: ...on available to NMSs using SNMP Managed devices sometimes called network elements can be any type of network based device including this PDU The agent running in this PDU has local knowledge of measur...

Страница 21: ...variables a managed device supports and to sequentially gather information from variable tables such as IP routing tables in managed devices Traps Managed devices use traps to asynchronously report c...

Страница 22: ...unity names is recommended to prevent unauthorized access to the device You can disable SNMP set commands to make use of SNMP read only SNMP Security Networking Functions SNMP read community name publ...

Страница 23: ...reshold Voltage Bank B R W High Threshold Voltage Bank C R W High Threshold Current Bank A R W High Threshold Current Bank B R W High Threshold Current Bank C R W High Threshold Current Bank T R W Low...

Страница 24: ...the MIBs From the GUI menu choose Options Load Unload MIBs Follow the instructions in the platform documentation to compile or load the PDU MIB From the Command Line Interface of HP OpenView or IBM N...

Страница 25: ...the factory Warranty Under normal use and specified operation conditions the PDU is warrant ed from the day of delivery for a period of three years During this pe riod if the product should fail the...

Страница 26: ...Installation and Operation Manual SCI P N 72A 196BAREM Series 72A 190BQREM Series Date 6 02 2008 26 27 0027 0111 PDU Front Panel IEC C13 Outlets 20A Circuit Breakers...

Отзывы: