![Spectron BE56-2U-VCR Скачать руководство пользователя страница 16](http://html.mh-extra.com/html/spectron/be56-2u-vcr/be56-2u-vcr_user-manual_1344154016.webp)
5 | Installation
Spectron Gas Control Systems GmbH
16
GES_BE56-2U-VCR_1020
5 Installation
5.1 General information
CAUTION
Injury or damage in the event of incorrect assembly or disassembly
Special steps are required for assembly and disassembly work on the product. Personal injuries
and damage to the product are possible.
a) Assembly and disassembly work may only be carried out by the installation engineer or ap-
propriately skilled specialist companies and persons.
b) The product is not permitted to be re-used following disassembly. All components must be
disposed correctly.
Depending on the type of gas, different requirements apply to the installation space of gas sup-
ply systems. It is essential to observe the legal regulations and trade association regulations,
and the information in the safety data sheets.
Familiarise yourself with the necessary work steps (see "
the necessary tools.
See also
2
5.2 Installation work
5.2.1 Installation
The pressure control panel can be mounted into a gas cylinder cabinet or on the room wall us-
ing C-mounting rails.
The scope of delivery includes sliding blocks as well as nuts (M8) and washers.
We recommend C-mounting rails with the following specifications:
Width: 26 mm
Height: 18 mm
Material thickness: 1.25 mm
Opening width: 14.3 mm
Material: Steel
5.2.2 Connecting the incoming and outgoing lines
All lines must be connected in accordance with the applicable standards and specifications and
tested with purge gas (pressure test and leak test). The specifications on dimensioning of the
connections are described in the "
1. Connect the exhaust gas outputs of the pressure control panel to the exhaust gas lines.
2. Connect the process gas output of the pressure control panel to the consumer.