SpectraPure DWS Скачать руководство пользователя страница 14

SpectraPure

SpectraPure®Inc.

  

480.894.5437   Call us toll-free  1.800.685.2783    

2167 East Fifth St,    Tempe, Arizona   85281

®

14

SANITIZING THE RO SYSTEM (once a year)

Sanitizing is recommended at least once every year or if water smells (or tastes) bad even after a post carbon filter 
replacement. A convenient time for sanitization is during a filter change-out. IT IS IMPORTANT THAT YOU HAVE CLEAN 
HANDS WHILE HANDLING INNER PARTS OF THE SYSTEM. 

1.  Be sure water supply to the RO/DI system is turned off, and the dispenser faucet is open. This will completely drain the 

pressure tank.

2.  Next, remove the 1/4” black tubing from the feed port of the membrane and lift membrane housing from clips.
3.  Remove the membrane housing cap by unscrewing it counterclockwise. Grasp the membrane stem with a pair of 

pliers and pull the membrane from the housing.

4.  Screw the cap back on to the membrane housing making sure that  the o-rings are in place.
5.  Reconnect the 1/4” black tubing to the feed port of the membrane.
6.  Remove sediment, carbon block, deionization cartridge and in-line post carbon filter.
7.  Put 1.5 - 2.0 oz. of household bleach in the left filter housing and fill it half-way with tap water. Now, put all filter 

housings back on the bracket, keeping the one with the bleach on the left side.

8.  Next, close the dispenser faucet (put lever in DOWN position). 
9.  Open feed supply valve 1/4 turn from closed position.
10.  Allow 15 minutes for the bleach solution to flow through the system. Then, open dispenser faucet and keep the lever 

in the UP position till some bleach solution is dispensed through the faucet. IMMEDIATELY close the faucet as soon as 
the bleach solution is dispensed. This will sterilize the faucet and the line going to the faucet. 

11.  Let the system sit for 2 hours.
12.  Open the dispenser faucet to drain bleach solution from the pressure tank as completely as possible and then close 

the faucet.

13.  Open the feed supply valve fully.
14.  Allow the tank to fill until pressure gauge reaches 40 psi. Then open the dispenser faucet and flush system until all 

bleach solution has been dispensed from the system. 

15.  Close the feed supply valve.
16.  Remove filter housings and membrane housings from the system and then rinse them with tap water and drain them 

completely.

17.  Put new replacement filters (sediment filter, carbon block filter & in-line post carbon filter) into the filter housings and 

put the membrane back into the membrane housing. You can use the same deionization cartridge if DI cartridge has 
not exhausted.

Open the feed supply valve and check for leaks. This completes the procedure.

RECHARGING THE BLADDER TANK

If the storage capacity of the tank is diminished significantly it is likely that the tank has lost its air charge. Recharging the 

bladder tank will restore its capacity.

Be sure water supply to the RO/DI system is turned off, and the dispenser faucet is open. This will completely drain the 

pressure tank.

1.  Put the dispenser faucet in the “open” position (lever in up position). Leave the faucet in the open position until the 

procedure is completed.

2.  Drain as much water as possible from the tank.
3.  Hook up an air pump to the “schrader” (tire) valve on the pressure tank and start pumping air into the tank.
4.  Expel all the water from the tank.
5.  Continue pumping air into the tank until the pressure reads NO MORE than 6 PSI.
6.  This completes the procedure. Turn system back on.

Note: Should this procedure fail to restore the capacity of the tank, it is very likely that the bladder in the tank is ruptured 

and the tank needs replacement.

MAINTENANCE PROCEDURES

Содержание DWS

Страница 1: ...roceeding with installation Failure to follow any attached instructions or operating parameter may lead to the product s failure and possible damage to property SpectraPure Inc assumes no responsibility for water damage due to leaks It is the user s responsibility to determine that the system is leak free ...

Страница 2: ...ting System Mounting Installation 13 Start up Procedures 13 Maintenance Procedures Sanitizing the RO System once a year 14 Recharging the Bladder Tank 14 Troubleshooting Guide 15 16 Warranty Information 17 Replacement Parts 18 Copyright 2006 by SpectraPure Inc ALL RIGHTS RESERVED No part of this publication may be reproduced stored in a retrieval system or transmitted in any form or by any means e...

Страница 3: ...SURE REGULATOR WILL BE REQUIRED OPERATIONAL SPECIFICATIONS MPDW KIT 1 4 Stage System 1 Membrane 25 40 60 90 1 1 Micron Sediment Filter 1 1 Micron Carbon Block 1 Inline 1 2 Carbon Block 1 Automatic Shut off Valve ASO 1 Inline 1lb Check Valve 1 Filter Wrench 1 3 or 4 Gallon Pressurized Storage Tank Blue or White 1 Non Air Gap Faucet with parts bag 1 Drain Saddle 1 Feed Water Adapter CONTENTS OF DRIN...

Страница 4: ...This is normal and is in compliance with UPC Codes STEP 1 Determine a desired location for the faucet on your sink and place a piece of masking tape on the location where the hole is to be drilled Mark the center of the hole on the tape STEP 2 Use a variable speed drill on the slowest speed Drill a 1 8 Pilot hole through both porcelain and metal casing of sink at the center of the desired location...

Страница 5: ... with the threads towards the end of the tube c Slip the Conical Compression Sleeve onto the Black Tube with the long slope pointing toward the end of the tube d Place the Insert into the end of the Black Tubing Make sure you push the insert in all the way e Tighten Compression Nut back on the Valve body STEP 5 When installation of the valve is complete check for leaks as follows a Close Feed Supp...

Страница 6: ...trate flow rate Procedure 1 Locate the Yellow waste line Direct the waste line into a sink drain or bucket 2 Locate the Blue product line Direct the product line into a sink drain or bucket NOTE For the DWS PP locate the yellow and blue line shown in the Diagram below and disconnect them from pump to proceed with Measuring Waste to Product Water Ratio 3 Turn on the Feed Supply Valve and let the sy...

Страница 7: ...out halfway between 164 7 in and 175 6 in 4 Using a new single edge razor blade carefully measure and then cut the flow restrictor to the total length indicated 5 Re insert the flow restrictor assembly into the yellow tubing and firmly re seat the insert into the end of the yellow tubing by carefully pressing on the insert with your thumbnail Care should be taken not to crush or other wise damage ...

Страница 8: ... 52 11 27 9 133 50 12 30 5 129 49 13 33 0 128 48 14 35 6 124 47 15 38 1 124 47 16 40 6 PRODUCT RATE CUT TO LENGTH FR 60 ml min gpd in cm 158 60 1 2 5 130 49 2 5 1 123 47 3 7 6 110 42 4 10 2 99 38 5 12 7 94 36 6 15 2 93 35 7 17 8 88 33 8 20 3 84 32 9 22 9 79 30 10 25 4 76 29 11 27 9 74 28 12 30 5 71 27 13 33 0 68 26 14 35 6 66 25 15 38 1 66 25 16 40 6 PRODUCT RATE CUT TO LENGTH FR 180 ml min gpd in...

Страница 9: ...vanized flange plastic spacer flat metal washer and hex nut in sequence over the threaded shaft and temporarily hand tighten then screw the push fitting onto the end of the threaded shaft D Insert the Blue 3 8 tubing into the Quick Connect Tubing Adapter E Connect the 1 4 yellow tubing to the smaller barb and connect the 3 8 Black tubing to the larger barb F Drop the entire assembly into the hole ...

Страница 10: ... rubber washer locating washer flat metal washer and hex nut in sequence over the threaded shaft and temporarily hand tighten Fig 5 C Insert the Blue Tube into the Compression Nut with the threads towards the end of the tube Then add the Compression Sleeve D Place the Insert into the end of the Blue Tubing Make sure you push the insert in all the way Screw the Compression Nut onto the threaded sha...

Страница 11: ...t a start position to prevent the drill bit from wandering Drill a 3 8 hole in the drain pipe through the mark on one side only do not drill through both sides of the drain pipe Clean any loose shavings from around the hole Refer to Figure 8 showing the drain saddle assembly sequence Press nuts in back half of drain saddle assembly Align the front half of the drain saddle by inserting a pencil thr...

Страница 12: ...t Blue tube that connects the faucet to the tank in half Connect the cut ends to the Inline Carbon so that the arrow FLOW is pointing towards the faucet NOTE WHEN REPLACING THE INLINE CARBON FILTER KEEP THE 2 THREADED PUSH FITTING TO REUSE WITH THE NEW FILTER REPLACEMENT rate of the stored water to decrease If this occurs verify correct tank pressure using a low pressure air gauge on the tire valv...

Страница 13: ...e Never run hot water 100 F through the system 2 NOTE It is important that air is purged from system during initial operation To do this orient the RO unit with the product permeate and reject brine water ports pointing upwards Round end of RO membrane housing is up pre filter housings are horizontal Allow a minimum of 15 minutes operation with this orientation 3 Before using the system allow thre...

Страница 14: ...the faucet and the line going to the faucet 11 Let the system sit for 2 hours 12 Open the dispenser faucet to drain bleach solution from the pressure tank as completely as possible and then close the faucet 13 Open the feed supply valve fully 14 Allow the tank to fill until pressure gauge reaches 40 psi Then open the dispenser faucet and flush system until all bleach solution has been dispensed fr...

Страница 15: ...essurize bladder to 6 psi when empty h too much pressure in bladder tank viii Repressure bladder to 6 psi when empty i ruptured bladder ix Replace tank j back pressure exerted by the pressurized bladder tank causes a reduction in production rate x Use of permeate pump retro fit kit PPRFK DI eliminates the back pressure 2 Zero production rate a Missing flow restrictor i Put flow restrictor in the y...

Страница 16: ...d bladder in storage tank ii Replace tank c Exhaused post carbon filter iii Replace post carbon filter 7 Milky colored water a Air in system i Air in the system is a normal occurrence with initial start up of the RO DI system This milky appearance will disappear during normal use within 1 2 weeks If condition reoccurs after filter changes drain tank 1 to 2 times 8 Reject yellow line never stops fl...

Страница 17: ...ents only for one year from date of receipt by the buyer providing that the loss of performance was not caused by fouling neglect or water conditions exceeding the feed water parameters listed in the applicable product manual refer to detailed membrane warranty information SpectraPure will on confirmation of loss of performance during the warranty period credit the pro rated amount of the current ...

Страница 18: ...F IN 10 10 in line post carbon filter Polishes water and removes any taste 4th Stage 6 V ASO 4JG ASO Valve Completely shuts off Product water and Waste water 7 VA CK IL 1 2LB 4 Check Valve Is used in conjunction with the ASO Valve REPLACEMENT OPTIONAL PARTS Replacement Parts for MPDW Replacement Parts for DWS DWS PP No Catalog No Replacement Parts Description 1 SF MT 0 5 10 Sediment Filter 0 5 Mic...

Отзывы: