SpectraLink 6300 MCU: Facility Preparation
PN: 1725-36122-001_N.doc
22
unlimited access to the Customer Support Hotline for additional
assistance.
Union labor
In some areas strict labor union rules will preclude the Polycom
representative’s ability to install the equipment without union
assistance. If such rules are in force in the local area, the customer
must ensure that sufficient union help is available at the scheduled
installation time to carry out the following functions:
•
Install Base Stations
•
Move and reinstall Base Stations
•
Make cabling changes at cross-connect blocks
•
Run cables
•
Make and modify electrical connections
Prepare Location for Shelves
Polycom recommends an operational temperature range of 0
º
–
40
º
C (31
º
–104
º
F). Optimal temperature is 20
º
C (68
º
F). Humidity
recommendation is 20%– 80% (non-condensing).
The MCU, composed of up to 20 shelves and one Intershelf Junction
Panel, is usually installed in or near the telephone equipment room. If
this is not possible, the MCU can be located anywhere that the
telephone system lines are accessible.
The number and arrangement of the system shelves depends on the
size and configuration of the system.
System Controller
Part Number
Shelves
Supported
Base Stations
Supported
Users
Supported
CSC301/ CSO301
1
60
160
CSC306/ CSO306
6
360
960
CSC320/ CSO320
20
1,000
3,200
Consideration should be given to:
•
Environmental conditions. The system outputs 28 BTUs per hour,
per interface module.
•
Space for the backboard or rack.
Содержание JPI300
Страница 1: ...March 2012 Edition 1725 36122 001 Version N SpectraLink 6300 MCU Installation SpectraLink 6000 System ...
Страница 8: ......
Страница 12: ...SpectraLink 6300 MCU Facility Preparation PN 1725 36122 001_N doc 12 SpectraLink 6000 System ...
Страница 36: ...SpectraLink 6300 MCU Facility Preparation PN 1725 36122 001_N doc 36 Four wire Digital Connector B ...
Страница 38: ......
Страница 54: ......
Страница 58: ......
Страница 66: ......