Service Procedure Quick Reference
Power Supply
Replacement
T50e
August 2017 V2
Page 1 of 2
Not a substitute for official published procedural guide
Detailed instructions/videos located at support.spectralogic.com
Tools & Supplies
New power supply kit(s) from Spectra Logic
#2 Phillips screwdriver
USB flash drive (FAT32)
o
For collecting Auto-support Log File (ASL)
Estimated Time
20 minutes
ESD Protection
Required
Library Power
Off
If the only installed power supply in the library is being replaced
OR
If there are two installed power supplies and both are being replaced
On
If there are two installed power supplies and only one is being replaced
Data I/O Operations
Discontinue
If the only installed power supply in the library is being replaced
OR
If there are two installed power supplies and both are being replaced
Verify with customer that data I/O to library has halted
Continue
If there are two installed power supplies and one is functioning normally
Robotic Movement
Discontinue
If the only installed power supply in the library is being replaced
OR
If there are two installed power supplies and both are being replaced
Verify robotic movement has been halted
Verify with customer that move requests from host have been halted
Continue
If there are two installed power supplies and one is functioning normally
Admin./Superuser
BlueScale Login
No