background image

13 

 

 

Continue lowering the Rear Panel / Instrument assembly down into the enclosure (See Figure 
16
). Take care that neither the cabling nor the instrument’s cloth hand strap becomes pinched 
as the assembly is lowered down into the enclosure.  
 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
Note that in order for the Alignment Probe to settle into the Alignment Receiver, the assembly 
may have to be tilted back/forth during the last 2-3 centimeters until the two parts engage 
correctly. 
 

 

 

Figure 16 Lowering Rear Panel Assembly Into Enclosure

 

Содержание i Series

Страница 1: ... SERIES UNDERWATER HOUSING USER MANUAL Revision 2 3 1 29 Firemens Way Poughkeepsie New York 12603 Voice 845 471 7007 Fax 845 471 7020 E mail svcinfo spectravista com Copyright 2019 Spectra Vista Corporation ...

Страница 2: ......

Страница 3: ...closure ASM512 500 ASM1024 500 6 SPECIAL NOTE Enclosure Leak Check 15 Removal of the Instrument from the Housing 15 Ballast Weights 18 Specifications ASM512 500 HR 512i 19 Consumable Parts List ASM512 500 19 Specifications ASM1024 500 Full Range Instruments 20 Consumable Parts List ASM1024 500 20 ...

Страница 4: ...nstrument Base Plate 7 Figure 9 Instrument Prior To Rear Panel Installation 8 Figure 10 HR 512i Instrument After Rear Panel Installation 8 Figure 11 HR 1024i Instrument After Rear Panel Installation 9 Figure 12 Instrument Battery Installed 9 Figure 13 Rear Panel Pre Installation Test 10 Figure 14 View Down Into Enclosure 11 Figure 15 Connecting Cabling 12 Figure 16 Lowering Rear Panel Assembly Int...

Страница 5: ...ly sufficient power for a full day s data collection SVC HR 512i instrument or 3 hours of data collection SVC i Series full range instruments Data collected during each dive may be downloaded via Bluetooth without opening the housing thus minimizing the risk of getting moisture into the housing or onto the instrument The removable rear panel which is constructed of robust clear acrylic is quickly ...

Страница 6: ...ttached to the bottom of the housing The skids also double as locations for adding diving weights to counteract any excess buoyancy of the submerged enclosure with the instrument installed shown in Figures 3 and 4 Although all hardware used is top quality stainless steel alloy it is recommended that the housing be rinsed off with fresh water after each diving session prior to drying and opening Sa...

Страница 7: ...SACRIFICIAL ZINC PROTECTIVE SKIDS TARGET ACQUISTION PUSHBUTTON HANDLES 4 TOTAL FRONT OPTICAL PORT Figure 4 ASM1024 500 Housing Front View PROTECTIVE SKIDS SACRIFICIAL ZINC 3 TOTAL TARGET ACQUISTION PUSHBUTTON HANDLES 4 TOTAL FRONT OPTICAL PORT ...

Страница 8: ...sually checking the sealing integrity of the Buna N O rings Caution Always verify that the thin black seal lines from the O rings squeeze can be seen through the rear panel If not determine the cause of the problem and correct it before submerging the housing The front viewing port is constructed of 0 75 inch thick optical glass sealed with one oil resistant Buna N O ring It is not recommended tha...

Страница 9: ...nal plunger is found on the right hand side of the transparent rear panel a waterproof pushbutton switch This plunger is operated by the diver s thumb and has been incorporated to take spectral scans when the instrument is oriented horizontally This brings the total number of plungers to eight Each plunger head retracts into a counter bore on the exterior of the acrylic panel which serves as a mea...

Страница 10: ...d by two aluminum trim blocks P N MAC1024166 See Figure 7 secured with the original lifting eyes 6 32 x 3 8 P N HDW001033 stainless steel machine screws The lifting eyes are removed in order to permit the installation of the instrument in a position as close as possible to the rear acrylic panel of the Underwater Housing Figure 7 Trim Blocks Right Side Shown Installed ORIGINAL LIFTING EYES TRIM BL...

Страница 11: ...This fixture holds the instrument s front plate rigidly in place within the Underwater Housing When installing the Alignment Probe carefully note its orientation and placement it must be placed exactly as shown in order to mate correctly with the Alignment Fixture mounted within the enclosure Make sure that the lens cover has been removed from the instrument s foreoptic Figure 8 Alignment Probe In...

Страница 12: ... the edge Figure 9 Instrument Prior To Rear Panel Installation Place the Rear Panel over the bottom of the instrument and fasten it to the instrument using four thumbscrews See Figure 10 HR 512i or Figure 11 HR 1024i Also connect the Interconnect Cable to the mate on the instrument s Optical Plate Figure 10 HR 512i Instrument After Rear Panel Installation INTERCONNECT CABLE PLUGS INTO OPTICAL PLAT...

Страница 13: ...lation Slide a fully charged battery into the assembly See Figure 12 The Rear Panel assembly onto the instrument is now complete Figure 12 Instrument Battery Installed 8 32 x 3 8 THUMBSCREWS 6 32 x 3 8 THUMBSCREWS INTERCONNECT CABLE PLUGS INTO OPTICAL PLATE ...

Страница 14: ...that they all work properly Do this test prior to installing the Rear Panel assembly into the enclosure Check that battery is fully charged by observing the LCD area below the BAT label this area displays the remaining percentage battery charge and should read close to 100 at the start of a dive POWER ON POWER OFF LASER TRIGGER Figure 13 Rear Panel Pre Installation Test BATTERY CHARGE PERCENTAGE ...

Страница 15: ... its connector made ready to attach to the mating connector on the bottom of the rear panel tray Look down into the enclosure and note the position of the Alignment Receiver This structure receives the corresponding Alignment Probe that is mounted to the instrument s base plate as shown in Figure 8 DRAW LATCHES DRAW LATCHES ALIGNMENT RECEIVER Figure 14 View Down Into Enclosure ...

Страница 16: ...l Instrument assembly just above the enclosure opening have a second person connect the internal trigger cable connector to its mate on the bottom of the Rear Panel See Figure 15 INTERNAL TRIGGER CABLE CONNECTOR Figure 15 Connecting Cabling ...

Страница 17: ...rument s cloth hand strap becomes pinched as the assembly is lowered down into the enclosure Note that in order for the Alignment Probe to settle into the Alignment Receiver the assembly may have to be tilted back forth during the last 2 3 centimeters until the two parts engage correctly Figure 16 Lowering Rear Panel Assembly Into Enclosure ...

Страница 18: ...r panel parallel to the rear surface of the enclosure as it is being inserted When installing the Rear Panel check that no objects are lying across the seal area Also verify that the seals are properly placed in the O ring grooves with nothing under them and confirm that they are not pinched when pulling the latches down Make certain that the seal lines seen as two dark stripes where the O rings c...

Страница 19: ...sing prior to removing the rear endplate Removal of the Instrument from the Housing This operation is basically the reverse of the installation sequence described previously It is best performed on a clean padded surface to avoid accidental damage to any components After ensuring that excess moisture has been removed from the external surfaces of the underwater housing release the four draw latche...

Страница 20: ...16 Figure 18 Draw Latch Used for Rear Panel Extraction LATCH HOOK DRAW LATCH CROSS BAR DRAW LATCH RELEASE TAB ...

Страница 21: ...om the enclosure When sliding the Rear Panel assembly out of the enclosure use extreme caution to avoid placing undue strain on the trigger cable and its electrical connector When the assembly has been slid sufficiently far out of the housing loosen the knurled electrical connector ring and disconnect the trigger cable from the bottom of the instrument Then complete the removal of the tray assembl...

Страница 22: ... to provide any necessary ballast The weights may be secured to the black skids located on the bottom of the housing using standard cable ties It is recommended that the unit be set up to be very slightly negative to allow for easy underwater maneuvering ...

Страница 23: ...al Window Material BK7 glass Environmental Temperature 10C to 40C Cleaning Do not allow salt water to dry on the enclosure After each use rinse outside surfaces with fresh water Wipe down exterior with soft dry cloth only Consumable Parts List ASM512 500 O Ring Lubricant Mfg Dow Corning P N Molykote 111 O Ring Front Optical Port Face Seal Mfg Parker P N 02 255 70 O Ring Rear Acrylic Panel Bore Sea...

Страница 24: ...Time 3 hours Optical Window Material BK7 glass Environmental Temperature 10C to 40C Cleaning Do not allow salt water to dry on the enclosure After each use rinse outside surfaces with fresh water Wipe down exterior with soft dry cloth only Consumable Parts List ASM1024 500 O Ring Lubricant Mfg Dow Corning P N Molykote 111 O Ring Front Optical Port Face Seal Mfg Parker P N 02 255 70 O Ring Rear Acr...

Страница 25: ...gn 2 1 0 All WWD 03 25 2019 Photos new hsg design 2 1 1 Installation WWD 04 16 2019 Photos new tray design 2 2 All LS 09 01 2019 Added full range instrument housing 2 3 All LS 12 10 2019 Combined the 512i and 1024i installation sections per new 512i housing 2 3 1 Installation WWD 7 12 2021 Added statement about rear panel parallel orientation during insertion ...