5 Installation
12/2014
VG 766.2320.050
EN
67
5.2.5 Pipe
sizing
Suction lines which are too long have significant disadvantages:
Higher resistance which results in less flow and a higher risk of
cavitation
Longer priming time (up to 12 min).
ATTENTION! The main housing and the screw connections are
made of ABS. A curing time of at least 12 hrs for the bonding
must be observed!
5.2.6 Laying
pipes
Keep the suction and pressure lines as short and straight as
possible.
Lay the suction and pressure lines below the water level.
Install valves in both the suction and pressure lines.
Avoid valves which close suddenly.
If the pump is positioned further away, the pipe dimensioning has to
be adapted so that an almost loss-free flow is ensured.
Use elbows instead of angles.
At a distance of between 5 m and 10 m:
Suction line d160/Pressure line d140
5.2.7 Shut-off
valves
Bond the intake-side pipe
(105)
and the delivery-side pipe
(106)
to the
shut-off valve
(34)
and the main housing
(1)
(Fig. 7)
.
5.2.8 Pump
shaft
The pump unit should be located in the shaft adjacent to the pool.
Ensure sufficient aeration and ventilation in the installation room and
provide a sufficient ground drain. Please observe the pipe dimensions.
A connection for equipotential bonding has to exist in the pump shaft.
5.2.9
Electrical control unit
The control for the counter swim unit is to be located in a dry room.
Connection of the supply lines and pump is to be carried out in
accordance with the enclosed wiring diagram. The applicable
regulations (VDE) are to be observed. Maximum distance between pool
and control box 10 m!
Содержание BADU Jet Primavera
Страница 30: ...5 Installation 30 DE VG 766 2320 050 12 2014 46 38 2 38 1 37 37 110 112 Abb 12 ...
Страница 42: ...9 Instandhaltung 42 DE VG 766 2320 050 12 2014 9 2 Austausch des LED Scheinwerfers ...
Страница 72: ...5 Installation 72 EN VG 766 2320 050 12 2014 46 38 2 38 1 37 37 110 112 Fig 12 ...
Страница 83: ...9 Maintenance 12 2014 VG 766 2320 050 EN 83 9 2 Replacing the LED floodlight ...
Страница 115: ...5 Installation 12 2014 VG 766 2320 050 FR 115 46 38 2 38 1 37 37 110 112 Fig 12 ...
Страница 128: ...9 Maintenance 128 FR VG 766 2320 050 12 2014 9 2 Remplacement du projecteur LED ...
Страница 158: ...5 Installatie 158 NL VG 766 2320 050 12 2014 46 38 2 38 1 37 37 110 112 Afb 12 ...
Страница 170: ...9 Onderhoud 170 NL VG 766 2320 050 12 2014 9 2 Vervangen van de LED spot ...
Страница 202: ...5 Installazione 202 IT VG 766 2320 050 12 2014 46 38 2 38 1 37 37 110 112 Fig 12 ...
Страница 214: ...9 Manutenzione 214 IT VG 766 2320 050 12 2014 9 2 Sostituzione del proiettore a LED ...
Страница 245: ...5 Instalación 12 2014 VG 766 2320 050 ES 245 46 38 2 38 1 37 37 110 112 Fig 12 ...
Страница 257: ...9 Mantenimiento 12 2014 VG 766 2320 050 ES 257 9 2 Sustitución del reflector LED ...