2 Safety
12/2014
VG 766.2320.050
EN
55
2.9 Preventing
material
damage
2.9.1
Leakage and pipe breakage
Non-observance of the curing time of the ABS bonding can result in
leaks and flooding.
Observe the curing time of at least 12 hrs for the ABS bonding.
Provide sufficient ground drainage.
Vibrations and thermal expansion can cause pipe breakage.
Install the system in a manner which reduces structure-borne and
airborne noise transmission. When doing so, observe relevant
regulations.
If the pipe forces are exceeded, leaks can occur at the screwed
connections or the pump itself.
Do not use the pump as a fixed point for the pipe line.
Connect pipes free of load and mount them elastically. Install
compensators if necessary.
2.9.2 Dry
run
If run dry, mechanical seals and synthetic parts can be destroyed within
only a few seconds.
Do not allow the pump to run dry. This also applies to checking the
rotation direction.
Purge air from the pump and suction line prior to start-up.
2.9.3 Cavitation
Incorrect configuration of the pipe dimensions and non-observance of
the prescribed mounting depth can cause cavitation.
If the distance between the pump and the main housing is great,
ensure an almost loss-free flow when configuring the pipes.
Observe the prescribed mounting depth of 300 mm.
Ensure that the suction line does not leak.
Open the valves completely.
Содержание BADU Jet Primavera
Страница 30: ...5 Installation 30 DE VG 766 2320 050 12 2014 46 38 2 38 1 37 37 110 112 Abb 12 ...
Страница 42: ...9 Instandhaltung 42 DE VG 766 2320 050 12 2014 9 2 Austausch des LED Scheinwerfers ...
Страница 72: ...5 Installation 72 EN VG 766 2320 050 12 2014 46 38 2 38 1 37 37 110 112 Fig 12 ...
Страница 83: ...9 Maintenance 12 2014 VG 766 2320 050 EN 83 9 2 Replacing the LED floodlight ...
Страница 115: ...5 Installation 12 2014 VG 766 2320 050 FR 115 46 38 2 38 1 37 37 110 112 Fig 12 ...
Страница 128: ...9 Maintenance 128 FR VG 766 2320 050 12 2014 9 2 Remplacement du projecteur LED ...
Страница 158: ...5 Installatie 158 NL VG 766 2320 050 12 2014 46 38 2 38 1 37 37 110 112 Afb 12 ...
Страница 170: ...9 Onderhoud 170 NL VG 766 2320 050 12 2014 9 2 Vervangen van de LED spot ...
Страница 202: ...5 Installazione 202 IT VG 766 2320 050 12 2014 46 38 2 38 1 37 37 110 112 Fig 12 ...
Страница 214: ...9 Manutenzione 214 IT VG 766 2320 050 12 2014 9 2 Sostituzione del proiettore a LED ...
Страница 245: ...5 Instalación 12 2014 VG 766 2320 050 ES 245 46 38 2 38 1 37 37 110 112 Fig 12 ...
Страница 257: ...9 Mantenimiento 12 2014 VG 766 2320 050 ES 257 9 2 Sustitución del reflector LED ...