![Speck pumpen BADU Block Series Скачать руководство пользователя страница 88](http://html.mh-extra.com/html/speck-pumpen/badu-block-series/badu-block-series_installation-and-operating-manual_1341795088.webp)
WARNING
Improper lifting/moving of heavy assemblies or components
Personal injury and damage to property!
▷
Use suitable transport devices, lifting equipment and lifting tackle to move
heavy assemblies or components.
CAUTION
Improper reassembly
Damage to the pump!
▷
Reassemble the pump (set) in accordance with the general rules of sound
engineering practice.
▷
Use original spare parts only.
Always reassemble the pump in accordance with the corresponding general assembly
drawing or exploded view.
Check O-rings for any damage and replace by new O-rings, if required.
Always use new gaskets, making sure that they have the same thickness as the old
ones.
Always fit gaskets of asbestos-free materials or graphite without using lubricants
(e.g. copper grease, graphite paste).
Avoid the use of assembly adhesives, if possible.
Should an assembly adhesive be required after all, use a commercially available
contact adhesive (e.g. Pattex) or sealant (e.g. HYLOMAR or Epple 33).
Only apply adhesive at selected points and in thin layers.
Never use quick-setting adhesives (cyanoacrylate adhesives).
Coat the locating surfaces of the individual components with graphite or similar
before reassembly.
For reassembly, tighten all screws and bolts as specified in this manual.
7.5.2
Installing the mechanical seal
The following rules must be observed when installing the mechanical seal:
▪
Work cleanly and accurately.
▪
Only remove the protective wrapping of the contact faces immediately before
installation takes place.
▪
Prevent any damage to the sealing surfaces or O-rings.
✓
The notes and steps stated in (
Section 7.5.1 Page 35) have been observed/
carried out.
✓
The bearing assembly as well as the individual parts have been placed in a clean
and level assembly area.
✓
All dismantled parts have been cleaned and checked for wear.
✓
Any damaged or worn parts have been replaced by original spare parts.
✓
The sealing surfaces have been cleaned.
1.
Clean shaft sleeve 523, and touch up any score marks or scratches with a
polishing cloth, if necessary.
If score marks or scratches are still visible, fit new shaft sleeve 523.
2.
Slide shaft sleeve 523 with new gasket 400.75 onto shaft 210.
3.
Clean the mating ring location in casing cover 161.
Sequence
Sealing elements
Assembly adhesives
Tightening torques
Installing the
mechanical seal
7 Servicing/Maintenance
36 of 52
BADU
®
Block
Содержание BADU Block Series
Страница 1: ...BADU Block Betriebs Montageanleitung ...
Страница 51: ......
Страница 52: ...VG 766 1330 052 K 07 14 KF SPN 1413 8 01 DE ...
Страница 53: ...BADU Block Installation Operating Manual ...
Страница 103: ......
Страница 104: ...VG 766 1330 053 K 07 14 KF SPN 1413 8 01 EN ...