Specified Controls SC-Z20 Скачать руководство пользователя страница 18

SC-Z20

SPECIFICATION SUGGESTIONS

4.

. EDPM seal installed on inside of round damper

Seals for Round Dampers
shell. Leakage shall be less than 2% at 3 inches of static pressure.

5.

Dampers shall be Specified Controls ZD-XX, ZD-XXXX or approved equal.

6.

VAV Diffusers shall be Specified Controls VD-XX or approved equal.

7.

All zone dampers to have minimum position adjustments.

1.03

ELECTRIC DAMPER ACTUATORS AND ACTUATOR CONTROL BOARDS

A.

. All zone damper actuators shall

Modulating and two position damper actuators
have sufficient reserve power to provide smooth action as specified.

1.

Damper actuators shall be capable of turning clockwise or counterclockwise
and be powered by a reversible motor which is connected to the output shaft.

2.

All actuators shall be factory wired to the damper control board.

3.

All damper actuators shall be mounted outside of the air stream.

B.

The damper actuator control board shall provide wiring terminals for all field and
factory wiring. The damper actuator board will also provide an output for
auxiliary zone heat.

1.

. Damper actuator and duct sensor.

Factory Wiring

2.

. Zone thermostat, wiring to system panel, and

Field Wiring
optional auxiliary heat.

1.04

BYPASS DAMPERS

A.

Bypass damper(s) shall be provided to maintain the proper duct static pressure.

1.

The bypass damper(s) shall be round or rectangular.

2.

Systems under 0.75” w.c. of static pressure shall use a barometric
bypass damper.

3.

Systems 0.75” w.c. and over of static pressure shall use an electronic
bypass damper with static pressure controller.

4.

The bypass damper(s) shall be sized for 90% of the total air flow at
2500 FPM.

Содержание SC-Z20

Страница 1: ...SC Z20 Commercial Zone Control System Modulating or Two position Installation Manual...

Страница 2: ...Works with single stage multi stage or heat pump systems No programming required Auxiliary heat control option for each zone Night setback option All low voltage wiring LEDs indicates status of equipm...

Страница 3: ...second stage The system will remain in whatever mode it is in for a minimum of fifteen minutes If equal heating and cooling calls take place cooling will receive priority Equipment mode of operation i...

Страница 4: ...SC Z20 MODULATING ZONE CONTROL SYSTEM WIRING AND LAYOUT GUIDE 3 SC Z20 NS NIGHT STAT SC Z20...

Страница 5: ...OOL HEAT COOL HEAT COOL HEAT COOL HEAT COOL HEAT COOL HEAT 4 AMP PC BOARD HP HC SYSTEM B O REV VALVE 3 ZONES OFF MINIMUM 2 ZONES OFF CALLS ON OFF ECONO SPEED UP MODE STATUS HEAT COOL DAS ACTIVE OCCUPI...

Страница 6: ...on Zones 1 20 RED Heat ON when there is a call for heating GREEN Cool ON when there is a call for cooling HVAC System W1 GREEN ON when first stage heat is energized W2 GREEN ON when second stage heat...

Страница 7: ...T COOL HEAT COOL HEAT COOL HEAT COOL HEAT COOL HEAT COOL HEAT 4 AMP PC BOARD HP HC SYSTEM B O REV VALVE 3 ZONES OFF MINIMUM 2 ZONES OFF CALLS ON OFF ECONO SPEED UP MODE TIME DELAYS DIVIDED BY 15 STATU...

Страница 8: ...AT Insert a small flat bladed screw driver in the release slot located on the bottom of the thermostat and pry straight up and away from the subbase Avoid twisting the case as this may stress the LCD...

Страница 9: ...rge air temperature at the damper is below 72 degrees the zone damper will open on a call for cooling SC Z20 PANEL NOTES Use standard 18 gauge thermostat wire Run four wire cable from the panel termin...

Страница 10: ...S DS HEAT COOL WIRE TO OPTIONAL SLAVE DAMPER UP TO 20 MAY BE WIRED IN PARALLEL SC Z20 T AUTO CHANGEOVER SPACE THERMOSTAT FACTORY JUMPER RED LED INDICATES A CALL FOR HEATING GREEN LED INDICATES A CALL...

Страница 11: ...t T terminals on the SC Z20 panel that places the system in the occupied or unoccupied mode of operation The thermostat can also be used with a SC T32 S1 Indoor Remote Sensor 24 volt power to the ther...

Страница 12: ...HE CLOCK AND DAY OF WEEK It is important that the time of day and day of the week is set properly so that occupied and unoccupied programs start on time 1 Touch the until the day of the week flashes T...

Страница 13: ...ram to additional days of the Program CPY week use the or arrow to add additional days Example UP DOWN Mon Tue Wed Thu Fri 13 Once you have selected the days to be copied touch will begin to flash and...

Страница 14: ...hat the HVAC equipment have two stages of heating and two stages of cooling The pressure drop through the zone dampers is negligible and should not be a factor when sizing branch duct runs Zone damper...

Страница 15: ...e from each zone damper Connect terminals and R C Y W R C Y W from each zone damper to the terminals labeled and on the interface board 18 4 thermostat wire is recommended SC Z20 NS PROGRAMMABLE NIGHT...

Страница 16: ...discharge air setpoint If the number of zones calling for heating and cooling are equal the system will operate in the cooling mode first This is known as Cooling Priority Each zone damper or diffuse...

Страница 17: ...ol shall be required for setup and not troubleshooting B The zone control panel shall be suitable for the indoor ambient Environment conditions and shall be rated for operation between 32 F and 120 F...

Страница 18: ...nected to the output shaft 2 All actuators shall be factory wired to the damper control board 3 All damper actuators shall be mounted outside of the air stream B The damper actuator control board shal...

Страница 19: ...ermostat wire 18 gauge minimum No shielded cable shall be required 3 Control wire and cable shall be installed in accordance with NEC 1 06 SERVICE AND GUARANTEE A The entire zone control system shall...

Отзывы: