9
A.
Complete Steps
A
through
F
from Procedure
1
to remove the entire seat from base.
B.
Remove attachment bolt for the Lift Piston at Yoke End. (Requires: 4mm Allen, 10mm Crescent
Wrench)
C.
Loosen jam-nut to allow piston to be unscrewed from release-head. (Requires: 14mm Crescent
Wrench)
D.
Turn piston to remove it from release-head.
E.
Screw jam-nut on new piston.
F.
Thread piston into Release-head. Turn piston until stem pin touches the pedal inside the release-
head.
6. Lift Piston Replacement and Calibration
6.B
6.F