BEF200-1
Operating Manual
ELECTRICAL INSTRUCTIONS
The points raised are based on many years practical experience not on text book theory. If
you follow these guidelines your time on site will be productive rather than frustrating.
The BEF200-1 machine is supplied with a specially commissioned 110v electric motor and
starter switch assembly. Each unit is fully tested and the safety overload relays have been
calibrated and set according to the manufacturers specifications. In the event of the
malfunction on a new machine the owner should first check that the power supply on site is
suitable and adequate.
The motor requires a 32amp 110v power supply.
To avoid voltage drop the cable size must be a minimum of 4.0mm 3 core. Maximum length of
cable not to exceed 30 metres.
The transformer must have a continuous rated output of at least 3 KVA. In practice this means
that a 5 KVA transformer must be used. Manufacturers of transformers have different
methods of rating their equipment.
The transformer and all cables should be fitted with 32 amp 110v plugs and sockets.
All cables should be fully uncoiled and never left wrapped around cable reels or tied in loops.
If the power is to be generated, the BEF200-1 requires a minimum 8kva generator.
The motor is protected with a safety trip in the panel. Should the trip be activated, you must
isolate the power supply, open the panel and reset the trip.
If the motor repeatedly cuts out then it will be damaged. The possible causes are
either an inadequate power supply, overloading of the machine, or an electrical fault. The
machine can only be overloaded by setting the depth of cut too low.
2
Содержание BEF200-1
Страница 2: ......
Страница 15: ......
Страница 16: ......
Страница 17: ...BEF200 1 Operating Manual 13 ...
Страница 18: ......
Страница 19: ......
Страница 20: ......
Страница 23: ...BEF200 1 Operating Manual 19 ...
Страница 24: ......