![Spanbilt Fasttrak WorkShop 2010 Скачать руководство пользователя страница 23](http://html.mh-extra.com/html/spanbilt/fasttrak-workshop-2010/fasttrak-workshop-2010_assembly-instructions-manual_1339370023.webp)
ASSEMBLE AND FIT RIDGE BEAM
Assemble the ridge beam on the ground as shown below.
NOTE:
The diagram below shows a 66 gable roof shed. The assembly process is the same for all gable roof sizes.
Overlap the two sides of the ridge beam securing them with six (6) screws per side. Ensure the
pre-drilled roof panel holes are to the top. Screw the two sides together using the diagram top right as a
g uide. J
oin the whole 4 sets of ridge beam to get a total length of 5865mm.
T
T
T
T
The pre punched
roof holes must
be to the top of
the assmebled
ridge beam
PAGE 14
5
8 6 5 mm
RIDGE BEAM ASSEMBLY
T
T
T
T
The pre punched
roof holes must
be to the top of
the assmebled
ridge beam
PAGE 23
5
8 6 5 mm
A
ssemble the ridge beam on the ground as shown below. Better to assemble one side in full length of 5865mm
then do the other length, later box it together.
O
ver lap two ridge beam by 346mm so that pre drilled holes will align on the side face.
Roof holes
on top
Roof holes
on top
Roof holes
on top
Roof holes
on top
Содержание Fasttrak WorkShop 2010
Страница 20: ...PAGE 20 FRONT WALL PANEL ...
Страница 44: ...NOTES PAGE 44 ...