2
24
24
24
7
HR83005.EPS
211560
Insert J-bolts (19) from mounting plate (2) into cement as shown. Move assembly around to release any
air pockets in cement, then rest mounting plate on cement drainage hill. Apply some pressure to level
mounting plate on top of drainage hill. Level mounting plate and square with playing surface. Clean off
any excess cement on mounting plate at this time and place washers (24) onto J-bolts.
PLAYING SURFACE
1" (2.54 cm)
SIDE VIEW
DRAINAGE HILL
PLAYING SURFACE
Fill hole with concrete. Tamp down concrete to release air pockets and build drainage hill.
IMPORTANT!
Check leveling of mounting plate
several times with carpenter’s level
while concrete is curing.
4.
5.
24
DO NOT PROCEED UNTIL CONCRETE HAS CURED
A MINIMUM OF 72 HOURS !
ALLOW ADDITIONAL TIME FOR COLD,
WET OR HUMID WEATHER.
STOP!