3
02/06
ID# M880961
24" (61 cm)
36" (91.4 cm)
Ensure ground is level with playing
surface, then dig pole hole.
GROUND
SURFACE
PLAYING
SURFACE
1.
Install threaded ends of J-bolts (1) through holes in
mounting plate (3) and secure as shown.
2.
3
2
2
2
1
3.
1
Install nut (2) to J-bolt (1) as
shown. Repeat procedure for
other three J-bolts (1).
2-1/2”
(6.35 cm)
CONTACT UTILITIES
BEFORE DIGGING.
WARNING!
IMPORTANT!
Make sure nuts are 2-1/2”
(6.35cm) from top of
J-Bolts.
Make sure J-bolts (1) are
in the illustrated position.
NOTE:
Nuts on the top of plate are
used for leveling the pole after
system is fully assembled.
NOTE: