STEP 8: INSTALLING AIR DISTRIBUTION COMPONENTS
All plenum duct and supply tubing runs as well as room
terminator locations must be in accordance with air
distribution system requirements listed in Section 1 of
this manual. Where taping of joints is required, UL181
approved tape is required.
Plenum Duct Installation
All tees, elbows and branch runs must be a minimum of 24"
from the fan coil unit or any other tee, elbow or branch run.
Keep all tees and elbows to a minimum to keep system
pressure drop on larger layouts to a minimum.
NOTICE: Refer to duct installation instructions
supplied with fan coil unit or follow manufacturers
instructions supplied with other duct system types.
CWC
HWC
HP
OB
PWC
FC
Cooling Water Coil Present
Cooling Water Coil Settings
Switch 1
No Cooling Water Coil Present
Heat Pump Present
Heat Pump Settings
Switch 3
No Heat Pump Present
ON
Potable Water Circulation Settings
Switch 5
OFF
Heating Water Coil Present
Heating Water Coil Settings
Switch 2
No Heating Water Coil Present
Energized in Cooling Mode
Changeover Valve Settings
Switch 4
Energized in Heating Mode
ON
Fan Circulation Settings
Switch 6
OFF
SpacePak J Series Control Dip Switch Settings
Fan On Delay for
Water Coil Heat Demands
Adjustable from
0 - 5 Minutes
SpacePak J Series
Control Variable
Time Delay Settings
0
2
Fan Off Delay for ALL
Heating and Cooling Cycles
Adjustable from
0 - 5 Minutes
0
2
1
2
3
4
5
6
SpacePak J Series Control Indicator LEDs
Power Indicator
The Power indicator will blink to indicate that the control
is operational.
Fan Prove Indicator
The Fan Prove indicator will illuminate when there is
power to the fan and the optional damper is in the open
position.
Note: The Fan Prove Terminal will also energize with
24VAC when the above conditions are met.
Fault Indicator
Fault Flash Codes:
Float Switch
1 Flash
Anti-Frost Switch
2 Flashes
Fan Prove Fault
3 Flashes
Note: All Flash Codes are latched until power is cycled,
even if the fault is cleared. The Float Switch requires