background image

 

Form 43471030 

-6-    

 

 

Sept 2011

 

6.1)

 

ACCESSORY PACKAGES 

 

A.

A.

A.

A.

 

Exhaust Hood Package, Part #42924000

Exhaust Hood Package, Part #42924000

Exhaust Hood Package, Part #42924000

Exhaust Hood Package, Part #42924000    

 
 

Contains: 

Exhaust Hood Assembly, #42925540……QTY–1 
#8-18 x ½ Self-Drilling Screws, #02189030……QTY–2 

4” (10cm)

7 1/2”

(19cm)

3 3/4” (10cm)

3 1/2” (9cm)

(15cm)

Bird

Screen

Side View

Front View

 

B.

B.

B.

B.

 

Lower Mounting Kit, Part #43515000

Lower Mounting Kit, Part #43515000

Lower Mounting Kit, Part #43515000

Lower Mounting Kit, Part #43515000    

The Lower Mounting Kit is required when the heater is 
installed at mounting heights  between 6  ft. and 8  ft. 
above a finished floor. 
 

Contains: 

Emitter Guard Kit, #43485000……QTY–1 
(The  Emitter  Guard  Kit  includes  an  aluminum 
decorative grille with side emitter guard holder panels.  
This item and the Draft Inducer Guard Kit make up the 
Lower  Mounting  Kit,  which  must  be  used  in 
installations with mounting heights between 6 ft. and 8 
ft.    This  item could  be used  separately  in  installations 
above  8  ft.,  however,  for  decorative  purposes  if 
desired.) 

 

 
 
 
 
 
 
Draft Inducer Guard Kit, #43486000……QTY–1 
(The  Draft  Inducer  Guard  Kit  is  an  aluminum  shield 
mounted  around  the  draft  inducer  (brackets  and 
screws included).  This item and the Emitter Guard Kit 
make up the Lower Mounting Kit, which must be used 
in  installations  with  mounting  heights  between  6  ft. 
and 8 ft.) 

 

 

 

C.

C.

C.

C.

 

Deflector Kit, Part #435

Deflector Kit, Part #435

Deflector Kit, Part #435

Deflector Kit, Part #43504000

04000

04000

04000    

The  Deflector  Kit  is  available  for  use  to  reduce  the 
clearances  to  combustibles  below  the  heater.    Refer 
to the Minimum Clearances to Combustibles Table

Minimum Clearances to Combustibles Table

Minimum Clearances to Combustibles Table

Minimum Clearances to Combustibles Table in 

Section  4.0)  when  using  this  Deflector  Kit.  Heater 

Heater 

Heater 

Heater 

must  be  mounte

must  be  mounte

must  be  mounte

must  be  mounted 

d  ONLY

ONLY

ONLY

ONLY     in  the  horizontal  position 

in  the  horizontal  position 

in  the  horizontal  position 

in  the  horizontal  position 

when using this kit.

when using this kit.

when using this kit.

when using this kit. 

 

Deflector

Deflector

Bracket

Hanger Bracket

(tube & reflector

components not

shown)

Deflector

10 1/2”

(267mm)

5 1/2”

(140mm)

 

Содержание CB40-L7

Страница 1: ...NOT DO NOT use any telephone in your building IMMEDIATELY IMMEDIATELY IMMEDIATELY IMMEDIATELY call your gas supplier from a neighbor s telephone Follow the gas supplier s instructions If you cannot re...

Страница 2: ...ation 27 19 0 Cleaning and Annual Maintenance 28 20 0 Troubleshooting Guide 29 21 0 Replacing Parts 33 21 1 Removal of Spark Electrode 33 21 2 Removing Main Burner and Gas Valve 34 21 3 Air Switch Pre...

Страница 3: ...ng rning rning rning instructions must be followed to prevent or avoid hazards which may cause serious injury property damage or death Caution Caution Caution Caution instructions must be followed to...

Страница 4: ...PA 409 latest edition Standard for Aircraft Hangars ANSI NFPA 88a latest edition Standard for Parking Structures and ANSI NFPA 88b latest edition Standard for Repair Garages with the following clearan...

Страница 5: ...les are posted on the Clearances to combustibles are posted on the Clearances to combustibles are posted on the Clearances to combustibles are posted on the control box control box control box control...

Страница 6: ...Supply Supply Supply Supply Current Current Current Current Rating Rating Rating Rating Natural or Propane MPT Male 3 4 Round 4 Round 120 Volt 60Hz 1 Phase 2 6 Amp Fuse Fuse Fuse Fuse Rating Rating Ra...

Страница 7: ...ver for decorative purposes if desired Draft Inducer Guard Kit 43486000 QTY 1 The Draft Inducer Guard Kit is an aluminum shield mounted around the draft inducer brackets and screws included This item...

Страница 8: ...ide View Bottom View Hanger Bracket QTY 2 Emitter Tube Reflector 8 FT Body Section 18 1 2 470mm 7 1 2 191mm Plastic Vacuum Air Tube 1 4 O D Tube Strain Relief Bushing Motor Leads Sight Glass 1 2 MPT G...

Страница 9: ...te Tube support hanger bracket U bolt clamp 5 16 Hex nuts 3 OD x 8 tube Mounting flange 3 hole Mounting flange 6 hole Suspension chain with turnbuckle Reflector foot end 5 1 2 80 10 1 2 Reflector cont...

Страница 10: ...ide sufficient lengths or swing joints to compensate for expansion See Figures b and c 5 Heaters subject to vibration must be provided with vibration isolating hangers 6 Heaters must not be supported...

Страница 11: ...Section 7 0 using proper suspension method see Section 9 0 1 1 80 chains for suspension 80 Suspension Chain 18 1 2 18 1 2 1 Trapeze Method Trapeze Method Trapeze Method Trapeze Method Individual Susp...

Страница 12: ...4 5 Attach the control box to the right hand control tube flange and secure with 1 4 20 locknuts The control box must be mounted with the perforated fresh air plate on top facing the ceiling 6 Attach...

Страница 13: ...eflector to clamp installation detail which allows the reflector to clamp installation detail which allows the reflector to clamp installation detail which allows the reflector to sl sl sl slide under...

Страница 14: ...ck that the gas fuel on the burner rating plate matches the fuel for the application 3 Check that the gas supply piping has the capacity for the total gas consumption of the heaters and any other equi...

Страница 15: ...e on a tubular type infrared heater per the standard for Connectors A gas connector certified for use on a tubular type infrared heater per the standard for Connectors for Gas Appliances ANSI Z21 24 C...

Страница 16: ...pressure All measurements MUST BE MUST BE MUST BE MUST BE made when this heater and all other gas burning equipment that is connected to the gas supply system are operating at maximum capacity 3 The c...

Страница 17: ...ECTRODE GAP 3 16 CONTROL CABINET White Red C HI LO 2 STAGE GAS VALVE White Blue Amber Light HI Fire Black Red Black White Black Black White DRAFT INDUCER MOTOR TRANSFORMER 120V PRIMARY 24V SECONDARY G...

Страница 18: ...NGLE HEATER PER THERMOSTAT SINGLE HEATER PER THERMOSTAT SINGLE HEATER PER THERMOSTAT SINGLE HEATER PER THERMOSTAT Ground N Neutral L1 Hot 120V Continue To Additional Heaters Fused Disconnect Switch Co...

Страница 19: ...lied D D D D MANUAL SWITCH MANUAL SWITCH MANUAL SWITCH MANUAL SWITCH CONNECTIONS CONNECTIONS CONNECTIONS CONNECTIONS MULTIPLE HEATERS MULTIPLE HEATERS MULTIPLE HEATERS MULTIPLE HEATERS OPERATION OPERA...

Страница 20: ...assing through a combustible roof shall extend through an approved clearance roof thimble Double wall Type B vent must be used for the portion of the vent system which passes through the combustible r...

Страница 21: ...height specified in the following table These minimum heights may be used provided the vent is not less than 8 feet 2 4m from any vertical wall or similar obstruction 2 All other gas vents shall term...

Страница 22: ...must be maintained between the outside wall and vent cap 18 clearance will provide stability under high wind conditions 5 The horizontal venting system shall not terminate Less than 4 ft 1 2m below 4...

Страница 23: ...be disconnected from heaters is found inoperative the heater should be disconnected from heaters is found inoperative the heater should be disconnected from the vent system and its entrance into the...

Страница 24: ...UNVENTED HEATERS UNVENTED HEATERS UNVENTED HEATERS COMMERCIAL AND INDUSTRIAL INSTALLATIONS ONLY COMMERCIAL AND INDUSTRIAL INSTALLATIONS ONLY COMMERCIAL AND INDUSTRIAL INSTALLATIONS ONLY COMMERCIAL AND...

Страница 25: ...and discarding the perforated cover and discarding the perforated cover and discarding the perforated cover and discarding the perforated cover An approved vent cap must be placed directly on the end...

Страница 26: ...ersaCap Type B 4 Diameter Single Wall Pipe Flashing 1 2 12mm fall per 20ft 6m toward vent terminal Horizontal Through Sidewall 6 15cm Minimum 4 Starting Collar field supplied 3 ft 91cm Minimum Vertica...

Страница 27: ...ghting and shutdown instructions are also shown on the permanent nameplate label attached to the he lighting and shutdown instructions are also shown on the permanent nameplate label attached to the h...

Страница 28: ...cess Panel 8 Restrainter Nipple 5 Long 9 Terminal Block and Shield 10 Air Switch 11 Relay 12 Gas Valve 13 3 Pole Terminal Block 14 Orifice 15 Thermostat Connection Block 16 Main Burner 17 Burner Clamp...

Страница 29: ...ines are not leaking Check the gas connection to the heater for any signs of damage fatigue or corrosion If there are any signs of damage to the gas connection or leaks found in the gas piping immedia...

Страница 30: ...wires Check the blower wheel Does it turn freely Yes Replace motor Check blower wheel Is there any damage Replace blower wheel Readjust blower wheel on shaft retighten set crew Check the air sensing t...

Страница 31: ...igh fire amber monitoring light come on in the control cabinet No Yes Is there 24 vac between terminals on the terminal block that are connected to HI and C of the gas valve Yes No Replace the high fi...

Страница 32: ...tinuity Is there 24V between terminals 1 and 5 on the relay Yes No Are transformer s two lead wires securely connected to L1 and L2 respectively Is there 24V between transformer terminals on the secon...

Страница 33: ...g problem Check the spark gap Is it 3 16 No Yes Adjust the spark gap to 3 16 Has all the air been purged from the gas supply lines No Yes Purge the gas supply line Check the inlet pressure to the gas...

Страница 34: ...on Refer to the Replacement Parts Guide in Section 23 0 for all replacement parts 21 1 REMOVAL OF SPARK ELECTRODE A 1 3 2 4 6 5 Access panel only opens to 90 3 16 1 Disconnect electrical supply and op...

Страница 35: ...ube 0 16 WC Connector Tee Digital or Inclined Water Manometer scale 0 2 w c Temporary 1 4 ID Silicone plastic tubing for pressure test Control Box Air sensing tube bracket 1 Open hinged access panel 2...

Страница 36: ...to gas valve d Replace spark module if fuse and power are OK IGNITION MODULE DIAGNOSTICS IGNITION MODULE DIAGNOSTICS IGNITION MODULE DIAGNOSTICS IGNITION MODULE DIAGNOSTICS Fenwal 35 Fenwal 35 Fenwal...

Страница 37: ...wheel turns freely and is not rubbing housing Blower wheel may have worked loose from shaft and jammed against housing d Check for blower wheel damage replace if necessary If no damage readjust blowe...

Страница 38: ...00 Motor Replacement Kit 1 2 03721000 Motor 1 3 30347000 Motor Spacer 4 per motor 4 4 42740000 Motor Plate 1 5 03723000 Blower Wheel 1 6 43221000 Draft Inducer Gasket 1 7 42744000 Sensing Tube Draft I...

Страница 39: ...C Natural Gas 40 50M Btu hr Models 1 34 30333260 Valve VR8205Q 3827 10 W C 4 W C Propane Gas 40 50M Btu hr Models 1 35 42701000 Orifice Fitting Test Gauge Connection 1 37 03259xxx xxx xxx xxx Orifice...

Страница 40: ...nt pour une period de 5 min avant d effectuer une nouvelle tentative d allumage 6 Pour fermer l appareil fermez le gaz et le courant electrique For indoor installation only Installer l int rieur seule...

Страница 41: ...Firing tube Firing tube Firing tube Firing tube for for for for CB CB CB CB4 4 4 40 0 0 0 50 50 50 50 9 44028131 7 1 2 Tube Replacement Kit 3 OD ALC w one 6 hole flange Exhaust tube Exhaust tube Exhau...

Отзывы: