background image

8

        

Southworth PalletPal Pallet Inverter/Rotator

INSTALLATION & 

INSTRUCTIONS

Preparation

1. Before you start to install the machine, check for local codes and 

ordinances, which may apply in your area.  It is your responsibility 

to obtain any necessary permits.

2. Read all of these installation instructions carefully.  Be sure to 

read and understand all of the warnings!

 

 

 

WARNING!

Protect the hydraulic power unit from rain or moisture.  

If the electrical parts in the power unit get wet, workers 

may be hurt by electrical shock or the electrical parts 

may fail.

WARNING!

The electric motor in the Pallet Rotator can create sparks.  

Do not install the hydraulic power unit in an area where 

flammable gases may be present.  

Positioning the lift

1. Remove the shipping material and unskid the machine.

2.  Move  the  machine  into  position,  supporting  the  base  frame.  

Mount  the  machine  on  a  firm  level  surface,  if  necessary,  insert 

shims to level. 

3. Adjust the clamping pressure to the desired load pressure using 

the adjustable pressure knob on the side of the unit.

WARNING!

If the Pallet Rotator is mounted on an unstable surface, 

it may tip over when in use.  You may be hurt, and the 

machine or the load may be damaged.

NOTICE

It is very important to keep the hydraulic oil free from 

dirt, dust, metal chips, water and other contamination.  

Most of the problems with hydraulic systems are caused 

by contamination of the oil.

Electrical Connections

DANGER!

The Pallet Rotator may use a power supply of up to 460 

Volt AC.  This voltage can kill you.  Do not work with the 

electrical parts unless you are a qualified electrician.

1. A  machine with a 115 Volt power unit needs to have a designated 

outlet and breaker of at least 30 AMP service. Consult Customer 

Service for performance concerns.

2. A machine designed for three phase AC, you must be sure the 

pump and motor is turning in the right direction.  The machine should 

start to move quickly when you press the up or down button.  If the 

machine does not move in 2 or 3 seconds, do not try to operate the 

machine!  Exchange any two of the three phase leads.  If this does 

not correct the problem, please contact Southworth ‘s Customer 

Service Department.

Testing

1. Check the level of the hydraulic oil.  With the machine in the home  

position the tank should be full, add oil if necessary.

2. Clear the area around the machine.  Remove any loose wires, 

lumber or other material that might get in the way of the machine 

as it is in use.

3. Operate the rotator through its full range of motion and operate 

the clamp and unclamp function.  The rotator and clamp functions 

should operate smoothly and quietly.  Raise and lower the lift a few 

times to check the clearances around the lift table.

WARNING!

As the machine moves, “pinch points” are created.  If 

you are standing too close to the machine when it is 

moving, your arm or leg may be caught in the moving 

parts and you may be hurt.  Stay away from the pinch 

points when the lift is moving.

Completing Installation

1. Test the machine with the rated load.  If the machine does not 

move and you hear a loud squealing noise, this means the pres

-

sure relief valve is operating.  Contact Southworth for instructions.

NOTICE

Do not continue to use the machine if this happens.  The 

pump will overheat very quickly and may be permanently 

damaged.  

NOTICE

Excessive clamping forces may damage the load.  Re

-

lease the clamp from the load before making any adjust-

ments.

OPERATING INSTRUCTIONS

•  Load dimensions and weight must be within the pa

-

rameters of the Pallet Inverter – 4,400 lbs max, and 

anywhere between 30” and 60” in height.

•  Load must be placed into and removed from the In

-

verter using a fork lift.

•  Press and hold the Unclamp button until the opening 

is large enough to accept the pallet load.

•  Press and hold the Clamp button until the load is secure 

within the platens of the Inverter.

•  Press  and  hold  the  Clockwise  or  Counterclockwise 

button until the pallet load is in the desired orientation.

•  Press the Unclamp button until the pallet load is free 

of the platens and can be removed with the fork lift.

When adjusting the clamping pressure on the SR-44 ensure the 

load is in a safe position so none of the product will transition to 

the operator.  Adjust the pressure knob counter clockwise for lower 

clamping forces and clockwise for higher clamping forces.  Test the 

load to ensure proper settings.

Содержание PalletPal SR-44

Страница 1: ...nverter Rotator SOUTHWORTH PRODUCTS CORP PO Box 1380 Portland ME 04104 1380 Telephone 1 800 743 1000 207 878 0700 Fax 207 797 4734 www SouthworthProducts com service SouthworthProducts com February 20...

Страница 2: ...l was current at the time of printing To obtain the latest most updated version please contact Southworth s Customer Service Department or go to our website www SouthworthProducts com under Parts Serv...

Страница 3: ...s 8 Testing 8 Completing Installation 8 OPERATOR INSTRUCTIONS 8 MAINTENANCE 9 Hazards 9 Routine periodic maintenance 9 TROUBLESHOOTING 9 ORDERING REPLACEMENT PARTS 19 WARRANTY 20 List of Figures Figur...

Страница 4: ...contact your dealer or Southworth Products Corp Southworth s product warranty is provided in the back of this manual This instruction manual is not intended to be or to create any other warranty expre...

Страница 5: ...e made by qualified personnel in conformance with Southworth s in structions Operators Only trained personnel and authorized personnel shall be permitted to operate the lift Before Operation Before us...

Страница 6: ...the signal word NOTICE Safety instruction signs use signal words that are specific to the situation DANGER indicates a hazardous situation which if not avoided will result in death or serious injury W...

Страница 7: ...d with its products Safety Considerations Southworth Pallet Rotators are designed and manufactured to meet applicable portions of the safety requirements of the ANSI Standard MH29 2 Industrial Tilters...

Страница 8: ...ds If this does not correct the problem please contact Southworth s Customer Service Department Testing 1 Check the level of the hydraulic oil With the machine in the home position the tank should be...

Страница 9: ...with the correct grade and properties The hydraulic fluid the machine is provided with is Conoco AW 32 Every six months 1 Visually inspect the center pivot bearing cylinder clevis pins and bushings A...

Страница 10: ...On a machine equipped with a three phase motor the motor may be single phasing When this happens the motor hums but does not turn If this is the case one lead of the three phase line has been interru...

Страница 11: ...allet Inverter Rotator 11 Note To safely perform maintenance rotate the lift to 90 degrees and install both maintenance chains Figure 1 Safe Servicing of the Lift Chain Locking Point Chain Labels and...

Страница 12: ...12 Southworth PalletPal Pallet Inverter Rotator Figure 2a Label Placement Figure 2b Label Placement...

Страница 13: ...Southworth PalletPal Pallet Inverter Rotator 13 Figure 2c Label Placement...

Страница 14: ...14 Southworth PalletPal Pallet Inverter Rotator Figure 3 Guardrail Configuration Note Guardrails must be installed on both sides before machine is put into operation...

Страница 15: ...let Inverter Rotator 15 Figure 4 Component Location Pump motor assembly Electrical control panel Valve stack Pressure gauge Rotator linkage Oil filter Flow control Cylinder Clamp pressure adjustment h...

Страница 16: ...16 Southworth PalletPal Pallet Inverter Rotator Pre 8 22 2012 Post 8 22 2012 Figure 5 Hydraulic Pump and Down Valve...

Страница 17: ...Southworth PalletPal Pallet Inverter Rotator 17 Figure 6 Electrical Connections for Three Phase AC...

Страница 18: ...18 Southworth PalletPal Pallet Inverter Rotator Figure 7 Hydraulic Schematic for Single Phase AC...

Страница 19: ...number This is stamped on the base of the cylinder housing To order replacement parts please call the Parts Department at 207 878 0700 or 800 743 1000 Parts are shipped subject to the following terms...

Страница 20: ...l and workmanship from the date of shipment Southworth Products Corp makes no warranty or representation with respect to the compli ance of any product with state or local safety or product standard c...

Отзывы: