background image

      

Southworth PalletPal Pallet Inverter/Rotator    

19

ORDERING REPLACEMENT PARTS

Southworth  has  carefully  chosen  the  components  in  your  lift  to  be  the  best 
available for the purpose.  Replacement parts should be identical to the original 
equipment.  Southworth will not be responsible for equipment failures resulting 
from the use of incorrect replacement parts or from unauthorized modifications 

of the machine.

Southworth will gladly supply you with replacement parts for your Southworth lift.  
With your order, please include the model number and the serial number of the 
lift. When you are ordering parts for a cylinder, also include the cylinder number.  
This is stamped on the base of the cylinder housing.

To order replacement parts, please call the Parts Department at (207)878-0700 
or (800)743-1000.  Parts are shipped subject to the following terms:

• 

FOB factory

• 

Returns only with the approval of our Parts Department

• 

Payment net 30 days (except parts covered by warranty)

• 

Freight collect (except parts covered by warranty)

• 

The warranty for repair parts is 30 days from date of shipment

Parts replaced under warranty are on a “charge-credit” basis.  We will invoice 
you when we ship the replacement part, then credit you when you return the 
worn or damaged part, and we verify that it is covered by our warranty. Labor is 
not covered under warranty for Parts orders.

SOUTHWORTH PRODUCTS CORP

Parts Department

Telephone: (207) 878-0700

(800) 743-1000

Fax:  (207) 797-4734

[email protected]

Содержание PalletPal SR-44

Страница 1: ...nverter Rotator SOUTHWORTH PRODUCTS CORP PO Box 1380 Portland ME 04104 1380 Telephone 1 800 743 1000 207 878 0700 Fax 207 797 4734 www SouthworthProducts com service SouthworthProducts com February 20...

Страница 2: ...l was current at the time of printing To obtain the latest most updated version please contact Southworth s Customer Service Department or go to our website www SouthworthProducts com under Parts Serv...

Страница 3: ...s 8 Testing 8 Completing Installation 8 OPERATOR INSTRUCTIONS 8 MAINTENANCE 9 Hazards 9 Routine periodic maintenance 9 TROUBLESHOOTING 9 ORDERING REPLACEMENT PARTS 19 WARRANTY 20 List of Figures Figur...

Страница 4: ...contact your dealer or Southworth Products Corp Southworth s product warranty is provided in the back of this manual This instruction manual is not intended to be or to create any other warranty expre...

Страница 5: ...e made by qualified personnel in conformance with Southworth s in structions Operators Only trained personnel and authorized personnel shall be permitted to operate the lift Before Operation Before us...

Страница 6: ...the signal word NOTICE Safety instruction signs use signal words that are specific to the situation DANGER indicates a hazardous situation which if not avoided will result in death or serious injury W...

Страница 7: ...d with its products Safety Considerations Southworth Pallet Rotators are designed and manufactured to meet applicable portions of the safety requirements of the ANSI Standard MH29 2 Industrial Tilters...

Страница 8: ...ds If this does not correct the problem please contact Southworth s Customer Service Department Testing 1 Check the level of the hydraulic oil With the machine in the home position the tank should be...

Страница 9: ...with the correct grade and properties The hydraulic fluid the machine is provided with is Conoco AW 32 Every six months 1 Visually inspect the center pivot bearing cylinder clevis pins and bushings A...

Страница 10: ...On a machine equipped with a three phase motor the motor may be single phasing When this happens the motor hums but does not turn If this is the case one lead of the three phase line has been interru...

Страница 11: ...allet Inverter Rotator 11 Note To safely perform maintenance rotate the lift to 90 degrees and install both maintenance chains Figure 1 Safe Servicing of the Lift Chain Locking Point Chain Labels and...

Страница 12: ...12 Southworth PalletPal Pallet Inverter Rotator Figure 2a Label Placement Figure 2b Label Placement...

Страница 13: ...Southworth PalletPal Pallet Inverter Rotator 13 Figure 2c Label Placement...

Страница 14: ...14 Southworth PalletPal Pallet Inverter Rotator Figure 3 Guardrail Configuration Note Guardrails must be installed on both sides before machine is put into operation...

Страница 15: ...let Inverter Rotator 15 Figure 4 Component Location Pump motor assembly Electrical control panel Valve stack Pressure gauge Rotator linkage Oil filter Flow control Cylinder Clamp pressure adjustment h...

Страница 16: ...16 Southworth PalletPal Pallet Inverter Rotator Pre 8 22 2012 Post 8 22 2012 Figure 5 Hydraulic Pump and Down Valve...

Страница 17: ...Southworth PalletPal Pallet Inverter Rotator 17 Figure 6 Electrical Connections for Three Phase AC...

Страница 18: ...18 Southworth PalletPal Pallet Inverter Rotator Figure 7 Hydraulic Schematic for Single Phase AC...

Страница 19: ...number This is stamped on the base of the cylinder housing To order replacement parts please call the Parts Department at 207 878 0700 or 800 743 1000 Parts are shipped subject to the following terms...

Страница 20: ...l and workmanship from the date of shipment Southworth Products Corp makes no warranty or representation with respect to the compli ance of any product with state or local safety or product standard c...

Отзывы: