F164
67
-34
v
111518
, P
age 4
of 6
Figure 5 – Lifting the LPM
Figure 6 – Eye Bolts on Column for Lifting
Figure 7 – Eye Bolts on Bed for Lifting
Страница 1: ...be threaded in but not touching the pad They will be adjusted during installation The machine must be wired refer to the installation and service manual for additional information Make sure to follow...
Страница 2: ...F16467 34 v111518 Page 2 of 6 Figure 1 Overall Dimensions of LPM...
Страница 3: ...F16467 34 v111518 Page 3 of 6 Figure 2 Leveling Screw Locations Figure 3 Lifting the LPM Figure 4 Lifting the LPM...
Страница 4: ...F16467 34 v111518 Page 4 of 6 Figure 5 Lifting the LPM Figure 6 Eye Bolts on Column for Lifting Figure 7 Eye Bolts on Bed for Lifting...
Страница 5: ...hine Grounding It is strongly recommended that the machine be earth grounded A dedicated copper rod 8 feet or so in length should be driven into the ground near the LPM A ground wire should then be ru...
Страница 6: ...LPM Figure 10 Alternative method for grounding the LPM Southwestern Industries Inc 2615 Homestead Place Rancho Dominguez CA 90220 5610 USA T 310 608 4422 F 310 764 2668 e mail sales southwesternindus...