INSTALLATION AND OPERATION MANUAL,
ELECTRIC COUNTER CONVECTION STEAMER, MODELS
R24
-3,
R24
-5
MANUAL 1195730 REV0 (11/22/2011) 15 HEAVY DUTY STEAM
DRAINING THE GENERATOR
Drain the steam generator after each day’s use to flush out minerals and minimize scale build-
up. The boiler drains automatically for about 4 to 6 minutes after the main power switch is
turned off.
5.0 CLEANING
WARNING: Disconnect the power supply to the appliance before
cleaning or servicing.
CAUTION: Do not use cleaning agents that are corrosive.
CAUTION: The appliance and its parts are hot. Use care when
operating, cleaning and servicing the appliance.
CAUTION: Live steam and accumulated hot water in the
compartment may be released when the door is opened.
At the end of each day, or between cooking cycles if necessary:
1. Turn main power switch OFF.
2. Remove pans and racks from compartment and wash in sink.
3. Wash compartment interior with clean water.
4. Use warm soapy water with a cloth or sponge to clean exposed bead of door gasket, rinse
with warm clear water and wipe with a dry cloth.
5. Wipe surfaces which touch door gasket with a cloth or sponge and warm soapy water, rinse
with warm clear water and wipe with a dry cloth.
Do not apply food oils or petroleum
solvents or lubricants directly to door gasket or surfaces which touch door gasket.
6. Wipe all solids away from drain opening in compartments to prevent clogging.