background image

 
 
 
 
 
 

 

 
 
 
 

FPS-900-RS 

Fire Protection Systems 

O&M Manual 

 

Version 3; 3/2020 

Содержание N2 Blast FPS-900-RS

Страница 1: ...FPS 900 RS Fire Protection Systems O M Manual Version 3 3 2020...

Страница 2: ...l Piping s and Hosing s 4 3 Electrical Requirements 4 4 Site Specifications 5 PRODUCT INSTALLATION 9 5 1 Installation Arrangement 6 SYSTEM DESIGN 11 6 1 Key Features 6 2 Specifications 7 SYSTEM OPERAT...

Страница 3: ...ation All personnel and their supervisors installing operating and maintaining the N2 BLAST must read and fully understand this manual prior to installing operating or performing maintenance The N2 BL...

Страница 4: ...uth Tek Systems will void the product s warranty 1 5 Service Return Policy Follow these procedures to return the system when performing site repairs is not possible The owner must get a Return Materia...

Страница 5: ...ogen generator s exhaust gas outside or to a large well ventilated room to avoid suffocation due to lack of oxygen Wear safety glasses if the cabinet door is open while the machine is running Use ear...

Страница 6: ...0 Page 6 of 28 Only use the FPS 900 RS for its designed purpose Only qualified service engineers may work on installation maintenance and repairs Unqualified people should not work on the equipment Do...

Страница 7: ...contact STS at 888 526 6284 to assess the damages Until Installation Store the N2 BLAST in a dry and climate controlled 40 100 F room Always keep N2 BLAST in an upright position or preferably in the...

Страница 8: ...cturers must meet all of the unit s flow pressure and temperature requirements If piping length between any equipment is greater than 50 feet consult with a piping contractor for proper line size 4 3...

Страница 9: ...inet d The lower bracket is slotted so that the sieve bed may be set down on top of the fastener for ease of installation e Once the bed is set on the lower fastener the top bracket should be secured...

Страница 10: ...ted to the AMD by threading a nipple into both parts c The threads are 1 2 NPTF Ensure that they are taped sufficiently to seal 8 Plumb all fittings as specified in product general arrangement drawing...

Страница 11: ...in a dirty environment 6 1 2 Air Filters The generator has an air inlet pre filters and two filters between the compressed air and O2 separation beds the particulate and coalescing The 5 micron partic...

Страница 12: ...he BlastOff Leak Detection System is a patented feature which sends an alarm if it detects a possible gas leak The alarm signal can be an audible visual and Fire Alarm Control Panel Power cycle the un...

Страница 13: ...d all warranties and may cause damages or malfunctions to the system This section describes the major control functions and instrumentations associated with the nitrogen generators All programs are pr...

Страница 14: ...f and trip the alarm dry contact in the unit if installed for 2 seconds so that proper functioning can be confirmed Next Button to navigate between the screens as filer hours program version unit ambi...

Страница 15: ...there is no power or power is lost on the system the contact will de energize and show a fault condition The alarm contact has a max rating of 6A at 250VAC and 2A at 24VDC Figure 2 FPS 900 RS Alarm Co...

Страница 16: ...ower for any reason This will cause the alarm contact to trigger 7 5 5 Filter Replacement Alarm Mode Once the nitrogen generator has been running for 1 000 hours or more the filter replacement alarm w...

Страница 17: ...n analog signal output 4 20 mA for current readings of different data points as follow i Ambient temperature 4 20 out dEgr F ii Oxygen content percent 4 20 out p CEnt iii Oxygen content ppm 4 20 out t...

Страница 18: ...entative or equipment installer for more detailed instructions Note The N2 Blast comes with 1 2 NPT Female inlet and outlet fittings Use Teflon tape or similar on all fittings to prevent leakage When...

Страница 19: ...nutes to ensure that no significant leaks are in the sprinkler system 8 2 Checking for Leaks The BlastOff provides early warning alarms for potential leakage With a suspected leak first listen for lea...

Страница 20: ...M Manual Version 3 3 2020 Page 20 of 28 the storage tank fittings If the nitrogen tank pressure did not change check the sprinkler piping in the building for leaks 4 Returning to run mode indicates t...

Страница 21: ...1 000 hours whichever comes first Follow these instructions to replace filters 1 Turn off the unit and remove the cabinet cover by removing four 4 screws 2 Locate the air filters on the bracket in the...

Страница 22: ...P The Leader in Nitrogen Generation Technology FPS 900 RS O M Manual Version 3 3 2020 Page 22 of 28 Figure 5 FPS 900 RS Filter locations...

Страница 23: ...stions about the performance and or maintenance of the system They will be best suited to answer your questions and your quickest solution on any issues you may have If they cannot be reached contact...

Страница 24: ...ps by about 7 10 psig the system should go into Run Mode and begin to refill the storage tank If the system is out of specifications the location of the issue must be identified Then contact the manuf...

Страница 25: ...to add set points and alarms to trace the oxygen content in system and maintain the purity of the nitrogen gas There is two sensor options for this feature Max O2 100 Range sensor O2 PCENT PPM Trace...

Страница 26: ...P The Leader in Nitrogen Generation Technology FPS 900 RS O M Manual Version 3 3 2020 Page 26 of 28 Figure 7 Setting screens Flow Diagram...

Страница 27: ...Address Units Status Read Write High oxygen Alarm Percent BOOL 00108 0 Good 1 Alarm R High oxygen Alarm PPM BOOL 00117 0 Good 1 Alarm R Low Pressure Alarm BOOL 000165 0 Good 1 Alarm R Pressure cut in...

Страница 28: ...changed to a different specification at the factory s option Any work performed by an unauthorized person company or usage of non factory parts may void all warranties to the product Any item not man...

Страница 29: ...RS 01 PJS 1 1 DRAWN 1 OF 2 B NUMBER SIZE SHEET DATE 06 18 19 PROJECT NAME ELECTRICAL SCHEMATICS WEIGHT MATERIAL FINISH ELECTRICAL SCHEMATIC RELIABLE INTEGRATION PROPRIETARY AND CONFIDENTIAL THE INFORM...

Страница 30: ...BLUE 0V INTERNAL 16 22 RED BLACK MV SIGNAL INTERNAL 16 22 WHITE 1 5V SIGNAL INTERNAL 16 22 ANY 4 20 MA SIGNAL FIELD TORQUE SPECIFICATIONS ITEM MIN MAX FUSE BLOCK 0 8 Nm 1 6 Nm TERMINAL BLOCK 0 4 Nm 0...

Отзывы: