25
Installer Setup
Deadband Settings
The Deadband is the number of degrees or minutes that the
thermostat waits before it initiates the stages of heating or cooling.
1st Stage Deadband
(setup step 29)
-
Specifies the minimum
temperature difference between the room temperature and the
desired setpoint before the first stage of heating or cooling is allowed
to turn on. (1 - 6 degrees) For example, if the heat setpoint is 68˚ and
the 1st Stage deadband is set to 2 degrees, the room temperature
will need to reach 66˚ before the heat turns on.
Fan Off Delay in Seconds
(setup step 40)
This feature allows the user to increase the cooling or electric strip
heating efficiency of the system. The thermostat may be programmed
to continue running the fan after a call for cooling or electric strip
heating has been satisfied. This delay can be set for 0, 30, 60, 90, or
120 seconds. If set to 0, the fan will not run after a call for cooling or
electric strip heating has been satisfied.
Humidity and Dehumidity
(setup steps 33-39, 47-49)
Humidity Only With Heat (Setup Step 33) - When this step is set to
ON, Humidity will not run without a demand for Heat.
Fan With Humidity Demand (Setup Step 34) - Specifies if the fan
should be turned on with a demand for Humidity.
Fan with Dehumidify Demand (Setup Step 35) - Specifies if the fan
should be turned on with a demand for Dehumidify.
Cool To Dehumidify (Setup Step 36) - Specifies if the cooling
equipment is allowed to turn on exclusively to lower room humidity.
(If set to OFF the following two steps will not appear.)
Содержание S1-TBSU304-S
Страница 2: ......
Страница 7: ...Setup Buttons 2 Get To Know Your Thermostat...
Страница 47: ...P N 88 1345 05 19 Patent Pending...