10
XGS 4300/4500
Operating Instructions
Putting into Operation
Caution:
Risk of explosion if battery is replaced by an incorrect type. Dispose of used
batteries according to the instructions.
Scope of Supply
The supplied parts are indicated in the Hardware Quick Start Guide.
Mounting Instructions
The XGS 4300/4500 appliances are designed for use in racks. Please consider the
following security tips:
Important note:
Functional reliability outside of a rack cannot be guaranteed.
Warnings and Precautions
The appliance can be operated safely if you observe the following notes and the notes on
the appliance itself.
Rack Precautions
Ì
Ensure that the leveling jacks on the bottom of the rack are fully extended
to the floor with the full weight of the rack resting on them.
Ì
In single rack installation, stabilizers should be attached to the rack.
Ì
In multiple rack installations, the racks should be coupled together.
Ì
Always make sure the rack is stable before extending a component from the rack.
Ì
You should extend only one component at a time—extending two or
more simultaneously may cause the rack to become unstable.
General Server Precautions
Ì
Installation must be performed by qualified personnel
Ì
Review the electrical and general safety precautions that came
with the components you are adding to your appliance.
Ì
Determine the placement of each component in the rack before you install the rails.
Ì
Install the heaviest server components on the bottom of the rack first, and then work up.
Ì
Allow the hot plug power supply modules to cool before touching them.
Ì
Always keep the rack‘s front door, all panels and server components
closed when not servicing to maintain proper cooling.
Содержание XGS 4300
Страница 1: ...Operating Instructions XGS 4300 4500...