– 9 –
SUB PANEL, MECHANISM DECK (MG-25F-136)
MAIN BOARD, HEAT SINK
Note:
Follow the disassembly procedure in the numerical order given.
SECTION 2
DISASSEMBLY
1
three screws
(PTT2.6
×
8)
2
sub panel
3
connector
(CN351)
5
screw
(PTT2.6
×
6)
6
mechanism deck
(MG-25F-136)
4
flexible flat cable
(CN301)
1
three screws
(PTT2.6
×
8)
3
two ground point
screws
5
three screws
(PTT2.6
×
8)
5
two screws
(PTT2.6
×
10)
1
screw
(PTT2.6
×
8)
5
two screws
(PTT2.6
×
8)
6
heat sink
2
rubber cap (25)
1
two screws
(PTT2.6
×
8)
4
main board
Содержание XR-C5200
Страница 3: ... 3 SECTION 1 GENERAL This section is extracted from instruction manual ...
Страница 4: ... 4 ...
Страница 5: ... 5 ...
Страница 6: ... 6 ...
Страница 7: ... 7 ...
Страница 8: ... 8 ...
Страница 21: ...XR C5200 23 24 6 4 SCHEMATIC DIAGRAM MAIN Board 2 2 See page 30 for IC Block Diagrams Page 27 ...
Страница 23: ...XR C5200 6 6 SCHEMATIC DIAGRAM KEY Board See page 18 for Waveform 27 28 Page 24 ...