24
e. Make sure that the triangular mark "A" on the L LOADING ASSEMBLY is aligned with the notch "B" on
the R LOADING ASSEMBLY as shown in Fig. 4-5.
f. Make sure that the teeth of the LOADING RACK ASSEMBLY are aligned with those of the R LOADING
ASSEMBLY so that the hole of the LOADING RACK ASSEMBLY aligns with the circular mark on the R
LOADING ASSEMBLY, as shown in Fig.4-5.
Содержание VX-14MW1E
Страница 5: ...CIRCUIT BLOCK DIAGRAM 4 ...
Страница 12: ...SCHEMATIC DIAGRAM 11 ...
Страница 13: ...SCHEMATIC DIAGRAM 12 ...
Страница 14: ...EXPLODED VIEW 13 1 VX 14R7 ...
Страница 15: ...EXPLODED VIEW 14 2 VX 21R7 ...
Страница 16: ...PRINTED CIRCUIT BOARD 15 1 MAIN PCB ...
Страница 21: ...PRINTED CIRCUIT BOARD 20 2 POWER PCB ...
Страница 22: ...PRINTED CIRCUIT BOARD 21 3 IF PCB ...
Страница 35: ...Technical Service Guide VCR MECHANISM UNIT K30 MECHA DECK SONY Corporation ...
Страница 38: ...3 1 2 1 WIRE DIAGRAM 1 2WIREDIAGRAM ...
Страница 42: ...7 2 1 2 PARTS LOCATION OF FRONT LOADING ASS Y A TOP VIEW B FRONT VIEW ...
Страница 72: ...37 6 EXPLODEDVIEWANDPARTSLIST 6 1 EXPLODEDVIEWOFDECKASS Y TOPVIEW ...
Страница 73: ...38 6 2 EXPLODEDVIEWOFDECKASS Y BOTTOMVIEW ...
Страница 74: ...39 6 3 EXPLODEDVIEWOFF LASS Y ...
Страница 75: ...40 ...
Страница 80: ...Sony Corporation Home Network Company Osaki West Tec 2 10 Osaki Shinagawa Kv 141 0032 Tokyo Japan ...