– 5 –
KV-DZ29M50
RM-GA002
SECTION 1
DISASSEMBLY
1-2.
SPEAKER REMOVAL
1-3.
CHASSIS ASSY REMOVAL
1-4.
SERVICE POSITION
1-5.
D AND D3 BOARDS REMOVAL
1-1.
REAR COVER REMOVAL
1-6.
F1 BOARD REMOVAL
1
Eleven screws
(+BVTP 4
×
16)
2
One screw
(+BVTP 3
×
12)
3
Rear cover
1
Two screws
(Washer Head)
(+P4x16)
1
D Board
2
D3 Board
2
F1 Board
1
Two screws
(+BVTP 3
×
12)
2
1
One stopper
One stopper
1
i
&
2
Make sure stopper is release & unscrew one screw
before taking out boards.
• Make sure all connector/bridge are fully inserted during
chassis installation.
3
One screw
(+BVTP 3
×
12)
3
2
1
1
Do not bend A1 board to avoid Bridge connector peel off.
2
Locate paper between A and D board to avoid heat sink touching.
3
Locate paper between A and C board to avoid heat sink touching.
• No need to connect earthing connector (F1 Board) during servicing.