2-11
2-3-9 Gear Loading Drive, Slider Cam,
Lever Load S, T Ass’y Removal
1) Remove the Belt Pulley. (Refer to Fig. 2-36)
2) Remove the Gear Loading Drive
1
after releasing Hook [A] in
the direction arrow as shown in detail drawing.
3) Remove the Slider Cam
2
.
4) Remove the Lever Load
3
, Link Load
5
& Lever Load
4
, Link
Load
6
.
Fig. 2-19 Gear Loading Drive, Slider Cam,
Lever T, S Load Ass’y Removal
2-3-10 Gear Loading Drive, Slider Cam,
Lever Load S, T Ass’y Assembly
1) When reinstalling, be sure to align dot of Lever Load T Ass’y
1
with dot of Lever Load S Ass’y
2
as shown in drawing, (Refer to
Timing Point 1).
2) Insert the Pin A,B,C,D into the Slider Cam
3
hole,
3) Be sure to align dot of Lever Load T
1
and dot of Gear Loading
Drive
4
, (Refer to Timing Point 2).
4) Aline dot of Gear Loading drive
4
with mark of Slider Cam
3
as shown in drawing (Refer to Timing Point 3).
Fig. 2-20 Gear Loading Drive, Slider Cam,
Lever Load S, T Ass’y Assembly
1
GEAR LOADING DRIVE
5
LINK LOAD S
3
LEVER LOAD S
4
LEVER LOAD T
6
LINK LOAD T
2
SLIDE CAM
HOOK(A)
2
LEVER LOAD S
1
LEVER LOAD T
LEVER LOAD S
LEVER LOAD T
PIN A
PIN C
PIN B
PIN D
3
SLIDER CAM
TIMING POINT 2
TIMING POINT 1
TIMING POINT 3
www. xiaoyu163. com
QQ 376315150
9
9
2
8
9
4
2
9
8
TEL 13942296513
9
9
2
8
9
4
2
9
8
0
5
1
5
1
3
6
7
3
Q
Q
TEL 13942296513 QQ 376315150 892498299
TEL 13942296513 QQ 376315150 892498299