– 15 –
1-2-19 Lever #9 Guide Ass’y Removal
1) Remove the Spring #9 Guide
Œ
.
2) Lift the Spring #9 Guide Ass’y
´
in the direction
of arrow “A”.
Note :
1) Take extreme care not to get grease on the tape
Guide Post.
2) After reinstalling, check the bottom side of the Post
#9 Guide to the top side of Main Base.
Œ
SPRING #9 GUIDE
´
LEVER #9 GUIDE ASS`Y
"A"
"B"
Fig. 1-25 Lever #9 Guide Ass’y Removal
1-2-20 FE Head Removal
1) Remove the screw
Œ
.
2) Lift the FE Head
´
.
Œ
FE HEAD
Fig. 1-26 FE Head Removal