HCD-HX50BTR/HX70BTR/HX80R/HX90BTR
5
HOW TO OPEN THE TRAY WHEN POWER SWITCH TURN OFF
ATTENTION WHEN INSTALLING Q12
Make a small hole in the location
of the figure.
Remove the panel (side R).
(Illustration of disaaaembly is omitted.)
chassis (main)
panel (front) block
Insert the driver.
Push the lever.
Open the tray.
– chassis (main) side R view –
12 mm
12 mm
Note 2:
Open more than 5 mm of screw (BVTP3x8)
installing Q12 in heatsink (REG)
to a chassis (main) from a screw point.
more than 5 mm
Q12
Note 1:
Be sure to use an original screw
(Part. No. 7-685-646-79 SCREW +BVTP 3X8 TYPE2 IT-3),
never use a screw longer than an original screw.
Q12
screw (BVTP3x8)
chassis (main)
chassis (main)
panel (back)
SW POWER board
SW POWER board
heatsink (REG)
Содержание HCD-HX50BTR
Страница 81: ...MEMO HCD HX50BTR HX70BTR HX80R HX90BTR 81 ...