2-13
DSC-WX1_L2
qs
Match seven convex parts of the Main Assy to seven ditches of the Fixed Tube and install it.
qd
Install the Naruto Gear on the Fixed Tube.
qf
Rotate the Naruto Gear and the lens is drawn out.
qg
Pass the Flexible Board through the hole of the Fixed Tube.
qh
Fix two claws of the Flexible Board into ribs of the Fixed Tube.
qj
Rotate the Naruto Gear and the lens is retractile.
Main Assy
Naruto Gear
Naruto Gear
Eyepiece Side View
Fixed Tube
Fixed Tube
Fixed Tube
Claws
Naruto Gear
Flexible Board