– 13 –
SECTION 4
MECHANISM DECK ASSEMBLY
Note:
Follow the assembly procedure in the numerical order given.
OPTICAL PICK-UP COMPLETE ASS’Y
GEAR (LOMINI)/(LOAD 1) ASS’Y
chuck plate
1
Move the lever (LOCK 3) in direction
A
, and return it a little in
direction
B
from the position where the chuck plate is moved
down to the lower limit.
A
B
4
stop ring 2.0 (E type)
5
tension spring (DH)
2
washer 2.5
3
optical pick-up complete ass’y
Note: Insert the shaft (A) first.
shaft (A)
gear (LOAD 2)
gear (LOMINI)
marking
Fig. A
chuck plate
2
Attach the gear (LOMINI) at the position
shown in Fig. A.
shaft (rotary prevention C)
1
Move the lever (LOCK 3)
fully in direction
B
to
move the chuck plate up.
B
4
stop ring 1.5 (E type)
3
Attach the gear (LOAD 1) ass’y
with its facing inside.
slit
Содержание CDX-616
Страница 4: ... 5 6 ...
Страница 25: ...CDX 616 37 38 7 11 SCHEMATIC DIAGRAM JACK Board Page 36 7 10 PRINTED WIRING BOARD JACK Board ...
Страница 44: ......
Страница 45: ......
Страница 48: ...CDX 616 4 4 2 4 SCHEMATIC DIAGRAM MAIN Board 1 2 ...
Страница 49: ...CDX 616 5 5 2 5 SCHEMATIC DIAGRAM MAIN Board 2 2 Page 6 ...
Страница 56: ...2 1 NEW FORMER DISCRIMINATION 7Y187A C MG 250C 137 Former type D MG 250D 137 New type ...
Страница 64: ...10 10 CDX 616 3 6 SCHEMATIC DIAGRAM MAIN Board 1 2 Page 7 ...
Страница 65: ...11 11 CDX 616 3 7 SCHEMATIC DIAGRAM MAIN Board 2 2 Page 12 ...