Working Instructions
, SP/
Mechanical
3_00021-1/FEA 209 544/78 C
Sony Ericsson Mobile Communications AB
5(23)
2 Reassembly
2.1 Process
Tools
•
Torque screwdriver, torx no.6 set to 15 Ncm.
•
Pair of tweezers
2.2 Equipment
•
ESD-gloves (cotton gloves)
•
ESD-wristband
2.3 Instructions
# Figure
Instruction
Note
1
Fig. 2.1
Place the PCB under the 2
hooks in the top. (
Fig. 2.1
)
2
Fig. 2.2
Press on the system
connector to make the
PCB fit tightly to the front
cover.
(Fig. 2.2)
3
Fig. 2.3
Mount the volume key
with a pair of tweezers.
(Fig. 2.3 & Fig. 2.4)
Position the volume key as
shown on the pictures.