Operating Manual | 5 Performing a work order
SONO-PR 200
34 / 47
Revision: 2.0 | 2022-10-14
5
Performing a work order
This section describes tasks that are necessary and/or useful for processing a work order.
The content structure and order follow the typical (recommended) work flow.
Before you begin
Before beginning a work order, please always check that:
•
the device has no visible damage,
•
the connection cables have no visible damage,
•
all connection cables are fitted with matching plugs and
•
none of the probes shows visible damage.
5.1
Connecting a probe (SONOTEC probes)
Validity and application
The following connection diagrams only apply to SONOTEC GmbH probes.
CAUTION
Destruction of probes due to transmitter pulses with wrong polarity!
The use of transmitter pulses with the wrong polarity may lead to destruction of probes.
•
Before setting the transmitter pulse, always check the manufacturer's instructions
for the particular probe.
•
Before connecting a probe, always set the suitable transmitter pulse type.
CAUTION
Faulty readings possible due to connection mix-up!
Incorrect connections may lead to faulty readings.
•
Always make sure to connect the probe according to instructions.
•
For connection of a probe, please refer to the description of the device front side
(see "3.5 Front side of the device", page 14).
Connect the probe to the SONO-PR 200 depending on the probe type.