Commissioning
7 Commissioning
7.1 Initial commissioning
7.1.1 Commissioning checklist
►
Check the following points during initial commissioning before switching on the
system:
Table 6:
Commissioning checklist
OK
Points to check
□
The installation location meets the requirements.
□
All DC lines are completely and correctly connected.
□
The Modbus line is correctly connected.
□
The Ethernet line is correctly connected.
□
The AC supply is correctly connected.
□
The AC line meets the requirements of all local and national guidelines for line dimensions.
□
The dimensions of the miniature circuit breaker installed in the AC line are correct.
□
A residual current device (RCD) has been correctly installed.
7.1.2 Commissioning report
►
Complete the commissioning report in the appendix of this document in full.
►
Make two copies of the commissioning report.
►
Give the first copy to the operator.
►
Send the second copy to sonnen GmbH within 5 working days.