
Electrical installation | 5
KD-492 | 22320 | EN | X02
27 / 40
Proceed with the supplied cable entry plate as described for option 1.
Option 3 - Supplied blanking plugs
For older hybrid storage systems models, it may be the case that there is no matching
opening for the supplied cable entry plate. Then the two supplied blanking plugs with mem-
brane grommet can be used.
Remove the two blanking plugs that are shown in the following illustration:
Illustration 15: Blanking plugs on the storage system
Using a suitable tool, make appropriate openings in the membrane of the supplied
blanking plugs.
Attach the plugs in the openings of the storage system.
Pass the two battery cables and the earthing cable through the larger plug.
Pass the control signal cable through the second plug.
Alternative: Cable gland with multiple sealing insert
Instead of the existing or supplied cable entry options, cable glands can also be used, which
needs to be selected depending on the diameter of the opening in the storage system. It is
important to use a multiple sealing insert if several lines are being led through one cabled
gland.
5.6.2 Connecting the earthing cable
1
4
5
2
3
Illustration 16: Connecting the earthing cable
1
Earth bolt in the storage system con-
trol cabinet
2
Contact disc
3
Earthing cable, coming from the
Backup-Box
4
Earthing cable, already connected
5
Self-locking nut
Connect the earthing cable to an earth bolt
inside the storage system.
Ensure that the components are arranged in the
order shown in the illustration.
Tighten the self-locking nut with a torque of
5 Nm.
Содержание 22320
Страница 38: ......
Страница 39: ......
Страница 40: ...sonnen GmbH Am Riedbach 1 D 87499 Wildpoldsried...