background image

8

This section will detail the next portion of the install process for drywall applications only including mudding 
the panel, sanding the panel, and painting the walls.  

(1) Mudding the Panel

Step 1- Fill 

Before applying mud, be sure that the sanding shield is still in place 
securing in the speaker opening.  Using quick-set compound, fill all 
gaps and let fully cure.  

Step 2- Tape

Using  mesh  tape,  apply  tape  around  all  adjoining  surfaces.  
This includes areas around the mounting platform and around 
the speaker opening as shown in the photo above. 

Below are the steps required in order to achieve a level 5 smooth wall/ceiling finish on an Architectural Series 
mounting platform.   If a ceiling with Architectural Series is specified with less than a level 5 finish, it is highly 
recommended that the specification for that wall be changed to level 5.  For more information about the 
di

erent levels of drywall finishes visit the USG website (

http://www.usg.com/documents/construction-

handbook/chapter5.pdf

)

Step 3- 1st Coat Mud 

Coat the tape and entire Mounting Platform with joint compound. 
This  ensures  all  pits  and  valleys  have  been  filled.  Before  fully 
cured scrape o

 any raised portions.  Let mud fully cure.  NOTE: 

this coat is a very thin layer.  DO NOT build the first layer of mud 
to the top of the mud dam.

Step 4- 2nd Coat Mud 

Next,  cover  the  entire  1st  coat  with  another  layer  of  mud  being 
sure to work from the opening and pulling outward towards the 
perimeter.  This coat will cover the entire 1st coat area plus even 
more to create a smooth transition.   Again, this coat should not 
reach the top of the mud dam.   It should be very thin.   Let mud 
fully cure but DO NOT SAND.

1

2

3

4

3

Содержание BPS6

Страница 1: ...IOR to attaching the panel bracket to the joists see photo 1 You will need to remove and discard the strain relief wire tie in order to attach the enclosure PLEASE NOTE the retrofit enclosure must be added before installing the panel bracket to the ceiling RETROFIT ENCLOSURES CANNOT BE ADDED AFTER THE DRYWALL WORK IS COMPLETE 6 2 Installing the Mounting Platform Step 1 Fasten Using three drywall s...

Страница 2: ...or AS speaker w retrofit enclosure Prewire to this location as normal but be sure to make wire connections on the back of the retrofit enclosure prior to continuing on to the next step It is highly recommended to attach a strain relief to the speaker wire to ensure that it stays connected to the terminals during the construction process Once the drywall work is complete there is no easy access to ...

Страница 3: ...s than a level 5 finish it is highly recommended that the specification for that wall be changed to level 5 For more information about the different levels of drywall finishes visit the USG website http www usg com documents construction handbook chapter5 pdf Step 3 1st Coat Mud Coat the tape and entire Mounting Platform with joint compound This ensures all pits and valleys have been filled Before ...

Страница 4: ... The sanding shield and drywall compound should be completely flush and drywall should be smooth Step 3 Pull Once the sanding is complete push firmly on the sanding shield to break any adhesion to surrounding surfaces Next remove the screw in the center of the shield Then remove the shield using a screw and a pair of pliers or a slotted screw driver Step 5 3rd 4th Coat Mud Continue to build coats ...

Страница 5: ...Once the painting is complete it will be discarded Step 2 Paint Painting a wall ceiling with Architectural Series openings is no different than painting any other drywall surface The paint can be rolled directly over the openings cutting around with a brush is not necessary Before the paint is completely dry it is a good idea to clean up the area inside the mud dam using a dry mini roller 1 or a dr...

Отзывы: