background image

Storing the mounting platform

It’s recommended that all materials are kept in their original packaging until just before installation. Store them o

 the ground in 

a secure, dry area until they are needed. Keep all materials dry and above freezing.  At the time of installation and finishing, all 
materials must be at a temperature of 55°F (12.8°C) or above.

Cutting the panel bracket

Mounting platforms are designed so that the opening can be positioned anywhere within standard 12” O.C. to 24” O.C. joist 
spacing.    However,  many  installations  will  require  the  panel  bracket  to  be  cut  to  size.    The  panel  is  made  of  100%  pressed 
gypsum board - it can be cut using the score and snap method  or using a circular saw with a fine tooth blade (or table saw).  To 
cut the panel using the score and snap method, first score the panel from the frontside - this may take multiple passes. Next, flip 
the panel over - face side down - and snap the panel towards the cut line.  

Retrofit Enclosures 

If using the optional retrofit enclosure for the AS38RS or AS68RS speakers, be sure to attach 
the enclosure PRIOR to attaching the panel bracket to the joists (see photo 1).  You will need 
to remove and discard the strain relief wire tie in order to attach the enclosure.  

PLEASE  NOTE:  the  retrofit  enclosure  must  be  added  before  installing  the  panel  bracket  to 
the ceiling - RETROFIT ENCLOSURES 

CANNOT

 BE ADDED AFTER THE DRYWALL WORK 

IS COMPLETE.  

6

(2) Installing the Mounting Platform

Step 1- Fasten

Using  three  drywall  screws  per  joist,  fasten  the  mounting 
platform to the framing.  
NOTE: if using the platform in conjunction with an AS BPS 
woofer, be sure to locate the opening of the platform within 
12”  of  the  woofer  location  (see  AS  BPS  woofer 
instructions)

Step 2 - Support or Trim 

Place  at  least  one  of  the  provided  patch  clips  on  each  of 
the sides with unsupported drywall.  Attach the patch clips 
to  the  panel  bracket  using  at  least  one  1-1/4”  drywall 
screw.    Trim  o

  any  unsupported  drywall  that  does  not 

have a patch clip attached.  

(1) Preparing the Platform for Install 

NOTE: The process of mounting the platform, prewiring, and installing drywall around the platform are the 
same for drywall, wood, stone, or any other solid surface installation.  

1

1

2

INSTALLATION MANUAL:  ARCHITECTURAL SERIES MOUNTING PLATFORM

DISCRETE OPENING SYSTEM, MEDIUM SPEAKER, BANDPASS SUBWOOFER (BPS6 & BPS8)

1

33-5937 - 6/14

Содержание BPS6

Страница 1: ...IOR to attaching the panel bracket to the joists see photo 1 You will need to remove and discard the strain relief wire tie in order to attach the enclosure PLEASE NOTE the retrofit enclosure must be added before installing the panel bracket to the ceiling RETROFIT ENCLOSURES CANNOT BE ADDED AFTER THE DRYWALL WORK IS COMPLETE 6 2 Installing the Mounting Platform Step 1 Fasten Using three drywall s...

Страница 2: ...or AS speaker w retrofit enclosure Prewire to this location as normal but be sure to make wire connections on the back of the retrofit enclosure prior to continuing on to the next step It is highly recommended to attach a strain relief to the speaker wire to ensure that it stays connected to the terminals during the construction process Once the drywall work is complete there is no easy access to ...

Страница 3: ...s than a level 5 finish it is highly recommended that the specification for that wall be changed to level 5 For more information about the different levels of drywall finishes visit the USG website http www usg com documents construction handbook chapter5 pdf Step 3 1st Coat Mud Coat the tape and entire Mounting Platform with joint compound This ensures all pits and valleys have been filled Before ...

Страница 4: ... The sanding shield and drywall compound should be completely flush and drywall should be smooth Step 3 Pull Once the sanding is complete push firmly on the sanding shield to break any adhesion to surrounding surfaces Next remove the screw in the center of the shield Then remove the shield using a screw and a pair of pliers or a slotted screw driver Step 5 3rd 4th Coat Mud Continue to build coats ...

Страница 5: ...Once the painting is complete it will be discarded Step 2 Paint Painting a wall ceiling with Architectural Series openings is no different than painting any other drywall surface The paint can be rolled directly over the openings cutting around with a brush is not necessary Before the paint is completely dry it is a good idea to clean up the area inside the mud dam using a dry mini roller 1 or a dr...