20
Electric connections
1
n
The steps :
o
Place the switch box on the pillar.
o
Attach the switch box on the pillar.
o
Connect the two cylinders.
o
Connection of the antena.
o
Connect the power supply cable.
o
Attach the switch box on the pillar.
Slide the electronics into the box.
You will have to use a little force to
put it into place. Attach it using the
provided attachment screw :
2
Place the box (preferentially at more than
one meter from the ground) against the
pillar and use it as a template for drilling
the attachment holes :
1
The box will be mounted with the stuffing box towards the bottom.
The cables will extend above it.
ON/OFF
AUTO
PROG
126
70
E
n
g
li
s
h
Electric connections
1
M2
Blue/black wire
Brown/green wire
M2
Blue/ black wire
Brown/green wire
M1
The cylinder M1 drives the
left leaf which
opens first and closes last.
The cylinder M1 drives the
left leaf which
opens first and closes last.
o
Connecting the two cylinders
The connection between the cylinders and the switch box must be made before connecting
the switch box to the power supply.
The cylinder installed on the gate pillar which opens first and closes last is the
cylinder M1.
Cylinder wiring:
M1
M1
M2
The cylinder M1 is always connected between terminals 11 and 12.
The cylinder M2 is always connected between terminals 13 and 14.
o
Place the switch box
on the pillar
.
The box will be mounted on the input side of the electric supply.
Содержание AXOVIA 150S