background image

 

SOLUXTEC GmbH 

Page 

12

 of 

14

 

version 1.4 - January 2014 

 

 

 

 

In any case a bi-polar DC-switch has to be installed. If it is not integrated in the 
inverter, this switch has to be installed as a separated part. The switch has to make 
sure the galvanic separation.

 

 

 
 
 
 
 
 
 
 

 

5. Instruction for installation

 

The following reference notes are to be adhered during the installation on location:

 

 

During work on roof all accident prevention regulations have to be respected. It is 
recommended to protect all uninvolved people nearby. A scaffold should be installed 
during work. 

 

 

During installation make sure not to strain the modules. 

 

 

If  lengthening

 

of  string  wiring  is  necessary  the  polarity  has  to  be  respected. 

 

 

The modules have to be mounted in a way which prevents rain water penetrating into 
the plugs. 

 

 

 

 

 

 

 

 

 

 

Содержание PowerSlate Mono Pure Glass Series

Страница 1: ...SOLUXTEC GmbH Page 1 of 14 version 1 4 January 2014 User Manual PowerSlate Mono Serie PURE GLASS PowerSlate Multi Serie PURE GLASS...

Страница 2: ...Page 2 of 14 version 1 4 January 2014 Index of contents 1 Introduction 3 2 Basic safety instructions 4 3 Transport and storage 5 4 Installation options 6 5 Instructions for mounting 10 6 Maintenance a...

Страница 3: ...g PV plant In case of an improper installation of the module there is a danger of fire risk This User Manual refers to the on roof mounting on flat roof bracing and on shore installations with or with...

Страница 4: ...sidered Also during low temperatures the maximum admissible open circuit voltage of the modules must not be exceeded Never open the junction box of the photovoltaic module Only use inspected safety eq...

Страница 5: ...ng Never lay down the solar panels rough or on the corners and use a correspondingly soft surface Enter the modules with both hands Do not drop the modules Never use the junction box as a handle bar P...

Страница 6: ...panel on roof before beginning of the installation In doing so the rail system should be justified absolutely equal otherwise it will come to bracing of the module and thereby it can lead to a breakag...

Страница 7: ...the module Do not stand or step on the module Do not drop the module or let the object fall on the module In order to avoid broken glass of modules do not place heavy objects on the modules Do not dr...

Страница 8: ......

Страница 9: ...n to get the best possible earnings In addition you should pay attention on the following points The collector slope of the module should be at least 10 based on the rain conditioned self purification...

Страница 10: ...the main equipotential bonding of the building The use of a cable of 10mm is recommended for this task The grounding has to be performed with a section of cable of 16mm to the main equipotential bondi...

Страница 11: ...f the module During operation of the PV plant it could be that the given technical values of tension and current are in real higher than calculated before under STC In order to prevent a possible disp...

Страница 12: ...following reference notes are to be adhered during the installation on location During work on roof all accident prevention regulations have to be respected It is recommended to protect all uninvolved...

Страница 13: ...t use only classic glass cleaner or cleaning alcohol Do not use galling or chemical cleaners do not scrape the module All modules are maintenance free but it could be useful to verify the PV installat...

Страница 14: ...A SOLUXTEC GmbH Route de Luxembourg 74 Werner von Siemens Stra e 25 L 6633 Wasserbillig D 54634 Bitburg Luxembourg Deutschland Phone 352 267410 Phone 49 0 6561 6937 265 Fax 352 26741080 Fax 49 0 6561...

Отзывы: