Page 8 / 17
INSTALLATION LOCATION
The location of the installation should preferably meet following requirements:
−
High position in the room on the wall (above 2m height)
−
Next to a timber/steel wall frame (to fix the wall mounting bracket)
−
Reasonable sheltered place from outside (from wind, rain, sun)
−
Away from bedhead to reduce noise disturbance during the night
−
Suitable for wiring from and to wall switch
INSTALLATION ADVICES
Wall Mounting Bracket
Hole Diameter 110 mm
External Waterproof Membrane & Tube
External Cowling (Plenum)
Drill or cut a 110mm hole through wall with a
2° slope towards outside.
(If required, remove temporary the wall
mounting bracket)
Choose location and install wall mounting
bracket from inside before installing the gib
board.
Install duct and trade seal from outside
with a 2° slope for weathertight connection.
Install external cowling from outside with the
bigger hole against the trade seal and the
slope on the top. Consider to drill a small
drain hole if cowling is exposed to rain.