SolutionAir elicent REC-Duo 100 Скачать руководство пользователя страница 8

 

Page 8 / 17 

 

INSTALLATION LOCATION 

The location of the installation should preferably meet following requirements: 

 

High position in the room on the wall (above 2m height) 

 

Next to a timber/steel wall frame (to fix the wall mounting bracket) 

 

Reasonable sheltered place from outside (from wind, rain, sun) 

 

Away from bedhead to reduce noise disturbance during the night 

 

Suitable for wiring from and to wall switch 

 

INSTALLATION ADVICES 

 
Wall Mounting Bracket 

 

 

 

Hole Diameter 110 mm 

 

 
External Waterproof Membrane & Tube 

 

External Cowling (Plenum) 

 

 

 

 

 

 

Drill or cut a 110mm hole through wall with a 
2° slope towards outside. 
(If required, remove temporary the wall 
mounting bracket) 

Choose location and install wall mounting 
bracket from inside before installing the gib 
board.  

Install duct and trade seal from outside  

with a 2° slope for weathertight connection. 

Install external cowling from outside with the 

bigger hole against the trade seal and the 
slope on the top. Consider to drill a small 
drain hole if cowling is exposed to rain. 

Содержание elicent REC-Duo 100

Страница 1: ...recovery unit Instruction Manual ENGLISH v1 4 WARNING The equipment must only be installed by a specialised technician Read and apply the manual before carrying out the installation Keep this manual i...

Страница 2: ...ogy and respects the standards in force regarding electrical equipment It conforms with the EMC European Directive in force regarding radio interference suppression and electro magnetic compatibility...

Страница 3: ...es precautions must be taken to avoid the back flow of gases into the room from the open flue of gas or other fuel burning appliances Toavoid the risk of fire do not using the product in the presence...

Страница 4: ...y The remote control does not work only in the Plus RC version Check the status of the battery DISMANTLING AND RECYCLING If a crossed out wheeled bin is illustrated on a product this means that the pr...

Страница 5: ...Page 5 17 OPERATING PRINCIPLE Extraction Cycle Push Intake Cycle Pull 60 seconds 60 seconds DIMENSIONS Main Unit REC Duo 100 EXTERNAL VENT EXTERNAL COWLING PLENUM...

Страница 6: ...ready assembled on the heat exchanger 8 Screws for fixing the wall power supply plate cover 9 Wall plugs 10 Screws for fixing power supply plate 11 Awl key for RESET button 12 Remote Control 1pc RC ve...

Страница 7: ...be considered to install the duct without cowling For retrofit projects we recommend to use always the cowling to allow a correct installation of the trade seal The Wall Mounting Bracket and the REC...

Страница 8: ...INSTALLATION ADVICES Wall Mounting Bracket Hole Diameter 110 mm External Waterproof Membrane Tube External Cowling Plenum Drill or cut a 110mm hole through wall with a 2 slope towards outside If requi...

Страница 9: ...go through power supply plate Switch is not included After installing the gib board over the mounting wall bracket cut out the whole and line up the power supply plate on top Connect power supply pla...

Страница 10: ...ude a main switch to power off the whole unit for e g maintenance Insert the REC Duo unit into the duct The power connectors need to line up and the plate snaps into a magnetic mount Complete external...

Страница 11: ...d to set the timer operating time only extraction from 0 to 30 minutes HY Humidistat This function is present in the REC DUO 100 MHY and REC DUO 100 PLUS RC models Adjust the trimmer HY screw blue to...

Страница 12: ...ned alternating rotation direction They will not need to be re synchronised REC Duo 100 PLUS RC For optimum operation installation in pairs is recommended up to a maximum of 6 devices DEVICE PAIRING O...

Страница 13: ...G THE REMOTE CONTROL Remove the transparent pull tab from the remote control battery compartment The remote control is enabled to operate in a radius of approximately 20m with the battery in a good fu...

Страница 14: ...signal SPEED ADJUSTMENT 2 KEYS 3 Speed 2 can be set between 70 and 100 In the factory settings mode this value is approximately 90 The setup is reflected on all synchronised machines Sequence 1 Selec...

Страница 15: ...djustable timer is provided for setting maximum speed boost duration from 0 to 30 minutes see paragraph TIMER AND HUMIDISTAT At the end of the timer cycle the unit automatically returns to the pre set...

Страница 16: ...E COOLING RC BUTTON 7 FLASHING YELLOW OR GREEN FORCED FLOW OPERATING RC Button 6 FLASHING WHITE LIGHT BLUE RECEIVING COMMAND FROM RC FLASHING RED PURPLE RESTORE FACTORY SETTINGS PURPLE LED INTENSITY A...

Страница 17: ...E REPLACE CLEAN FILTERS NOTICE RED FLASHING LED Press the button RESET located at the base of the front support of the ventilation unit for more than 5 seconds When the LEDs turn violet the reset succ...

Отзывы: