12
User Manual UM0006_ASW3000-10000-T_EN_V01_0221
RCM Mark
The product complies with the requirements of the
applicable Australian standards.
Capacitors discharge
Before opening the covers, the inverter must be
disconnected from the grid and PV array. Wait at
least 5 minutes to allow the energy storage
capacitors to fully discharge.
Observe the documentation
Observe all documentation supplied with the
product
3 Unpacking
3.1 Scope of delivery
Obje
ct
Description
Quantit
y
A
Inverter
1 piece
B
Wall bracket
1 piece
C
Documentation
1 set
D
Smart meter terminal
1 piece
E
Magnetic ring(optional)
1 piece
F
WiFi Stick(optional)
1 piece
G
DC connector
2 pairs
H
Screw accessory
1 set
I
AC connector
1 piece
J
Communication Cover(optional)
1 set