21
SOLID AIR ® INTERNATIONAL
•
T +31 598 36 12 21
•
www.solid-air.com
•
7.2 Commissioning procedure
Connect the power cable and accessories in accordance with the wiring diagram provided.
A high leakage current can be expected due to the EC motors.
Ensure that a secure earth connection is in place before connecting the power supply and commissioning.
If control voltage is present or a set speed is saved, the EC fans will restart automatically, e.g. after a power
failure.
•
Switch the isolator ON.
•
Wait until the BMK programming unit initialises and changes to the display mode.
•
Select the required operating mode at the BMK; the system will start with the preset parameters.
•
To modify functions and parameters, see the installation and operating instructions provided.
Where the system is not commissioned by Solid Air, check all inputs and outputs for correct wiring
and function:
•
Frost protection function.
•
Fan rotational direction.
•
Outdoor air/extract air damper rotational direction.
•
Plausible sensor values (room sensor, supply air sensor, extract air sensor, outdoor air sensor, ice sensor).
•
Measure motor currents.
•
Motor protection (thermal contacts/PTC thermistor).
•
Airflow monitoring.
•
Filter monitoring.
•
Bypass damper function (rotational direction).
•
Heating actuator.
•
Heating circuit pump.
•
As well as all other system-specific functions.
The Solid Air warranty will be void if the function test is not carried out correctly.