
TOP RAIL INSTALLATION
NOTE: Top Rail and the side Panels are offset to provide the proper pitch to the rear of (5/16”). This is necessary
for
proper condensation utilization and drainage. If you are not using the side panels, the rear pitch must still be main
tained.
1
. Attach the top rail onto the top of the outer case using four
Short
S
crews.
7