SOLE ALPHA 3 Скачать руководство пользователя страница 5

5

1.4. Carefully lower the product so that the support frames touch the ground (photo 3) and provided
this is the most suitable place (no obstacles etc.) secure it to the ground with 4 raw-plugs through
the holes on the base of the support frames.

Photo 3

2. PLUMBING CONNECTION

2.1. A pipe with a blue rubber ring is situated at point C (photo 2). This is the cold water supply inlet.
Screw the safety valve on this pipe, and then connect the cold water mains. The safety valve can
be found in the small package containing screws etc. accompanying the product.
However in the case where a water supply mains with pressure does not exist and water is supplied
through a water tank which is situated a little higher than the product, do not use the safety valve.
The safety valve requires at least 1 bar pressure in order to allow the water to pass through. A gate
valve should also be connected to the cold water pipe so that the water supply can be shut off when
necessary.

2.2. A pipe with a red rubber ring is situated at point B (photo 2). This pipe is the hot water outlet.
Connect this pipe to the hot water distribution network for consumption.

3. WARNING

The hot water pipe must be well insulated in order to prevent the reduction in temperature before
the  water  reaching  consumption.  If  the  ambient  temperature  of  your  area  reaches  temperatures
lower  than  0°C,  it  is  necessary  to  insulate  the  cold  water  pipe  as well,  in  order  to  prevent  it  from
freezing and breaking.
This product has been manufactured to withstand up to -15°C for 2 consecutive days. In case we
have such conditions for more consecutive days, a hot water tap must be left open and some water
must run through it continuously to avoid any damage or switch on the electric heating element for 1
hour per day/night.

R

F

Содержание ALPHA 3

Страница 1: ...GB INSTALLATION MANUAL USERS MANUAL INTEGRATED SOLAR WATER HEATER 3...

Страница 2: ...2...

Страница 3: ...must be moved further back so that the distance between the product and the obstacle is twice the height of the obstacle Photo 1 1 2 Unfold the supporting aluminum frames which are folded in the back...

Страница 4: ...e higher than the proper place which is described earlier This can be applied in the case of hotel installations specifically for hotels which are fully booked during the summer and are either closed...

Страница 5: ...bar pressure in order to allow the water to pass through A gate valve should also be connected to the cold water pipe so that the water supply can be shut off when necessary 2 2 A pipe with a red rub...

Страница 6: ...d properly to the ground of the building The electric heating element could be 1 5 2 0 3 0 or 4 0kW and contains a thermostat incorporated in it which has been fixed at 60 C at our factory If a differ...

Страница 7: ...s during the winter and 17 00 hours during the summer Maximum temperatures range from 60 C to 80 C depending on the season the product s inclination and provided we have not consumed any water earlier...

Страница 8: ...8 SOLE S A SOLAR DOMESTIC APPLIANCES MANUFACTURER Lefktron Laikon Agonon 136 71 Acharnai Athens Greece Tel 30210 2389500 Fax 30210 2389502 Email export sole gr www sole gr www eurostar solar com...

Отзывы: